Similar Projects
New Elementary School
New Construction
Conception
$55,000,000 est. value
Portland, OR

New Elementary School
New Construction - 86,000 SF
Design
$29,500,000 est. value
Sisters, OR

Conger Elementary School Restrooms
Renovation
Bidding
$200,000 est. value
Klamath Falls, OR 97601

Construction Manager - Cannon Beach Elementary School Renovation
Renovation - 13,500 SF
Bidding
$700,000 est. value
Cannon Beach, OR 97110

District-wide Card Access Control System
Renovation
Sub-Bidding
$69,000 CJ est. value
Madras, OR 97741

Franklin K-8 School
Renovation, Addition
Post-Bid
Corvallis, OR 97330

Mountain View Elementary Renovation and Addition
Renovation, Addition
Post-Bid
Corvallis, OR

Shasta Elementary School Restrooms Remodel
Renovation, Alteration
Results
Klamath Falls, OR 97625

Vose Elementary Classroom Addition
Renovation, Addition, Alteration - 9,850 SF
Results
Beaverton, OR 97008

Yaquina View Elementary New Gymnasium
New Construction
Construction
Newport, OR 97365

Monroe Grade School - New Construction of a Covered Play Shelter
Infrastructure
Bidding
$275,000 CJ est. value
Monroe, OR 97456

Pringle Elementary School
Addition, Demolition, Alteration
Post-Bid
Salem, OR

Construction Manager and General Contractors
Renovation, Addition
Results
Redmond, OR 97756

Office Remodel for Migrant Education
Build-out
Bidding
$500,000 CJ est. value
Eugene, OR 97402

Keizer Elementary Addition & Renovation
Renovation, Addition
Post-Bid
Keizer, OR

Last Updated 07/21/2022 02:18 PM
Project Title

RFQ Contractor - McKinley Seismic /Roof General Contractor Upgrades

Physical Address View project details and contacts
City, State (County) Beaverton, OR 97006   (Washington County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,700,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this Solicitation is to establish a Pre-Qualified List of Bidders for the provision of Construction Services for the McKinley Seismic Upgrades and Reroof. All questions and comments regarding this Solicitation must be directed ONLY IN WRITING to Larry Pelatt, Purchasing Manager, by e-mail to: contracts@beaverton.k12.or.us. Deadline for Questions : June 22, 2022 The project consists of seismic upgrades to align with Oregon Seismic Rehabilitation Grant Program funding source, re-roof and related work. The school will not be occupied during construction. The location of the project is McKinley Elementary, 1500 NW 185th Ave, Beaverton, OR 97006.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents