Project Title | Site 20 New Reservoir Construction - Town of Gilbert |
Physical Address | View project details and contacts |
City, State (County) | Gilbert, AZ 85297 (Maricopa County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Request for Qualifications, Design Development, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $13,700,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of this project includes but is not limited to the following: site work for a water / sewer project. As of November 2, 2022, the owner has selected a Construction Manager. The project is expected to start construction in next fall.” This will be a Construction Manager at Risk Project pursuant to ARS Section 34-601 et seq. A general description of the Project is: Design and construct a 4-million-gallon concrete reservoir to provide additional storage at Water Site 20, located at the northwest corner of Power and Queen Creek Roads. A new booster pump station will be constructed to meet the current/future demands of Zone 3. Following completion of the new reservoir, the existing 2-million-gallon steel reservoir will be demolished. Design will be completed for a future well onsite and a pump to waste basin to serve both the new well and existing Well 20, located on the southwest corner of Power and Queen Creek Roads. SOQ Format: Each SOQ received must be in accordance with the format and information provided within the Request for Qualifications package. Any submittal that does not conform, in all material respects to what is outlined in the RFQ, will be considered non-responsive. Each SOQ shall be submitted in a sealed envelope per the directions provided in the RFQ. Solicitation Transparency Policy: Beginning on the date this Solicitation is issued and continuing until either the date a contract is awarded or this Solicitation is withdrawn by Gilbert, all persons or entities who respond or intend to respond to this Solicitation, including without limitation their employees, agents, representatives, partners, subcontractors, consultants, joint venturers, members, lobbyists, or attorneys (collectively, "Proposers"), shall only discuss matters associated with this Solicitation with the Procurement Officer designated in this Solicitation and shall not have any direct or indirect contact about this Solicitation with any other Town staff or Town official, including, without limitation, members of the evaluation panel, the Town Manager, Deputy Town Managers, the Mayor, or any member of the Gilbert Town Council. As long as the subject matter of the Solicitation is not discussed, Proposers may continue to conduct business with Gilbert. Notwithstanding the foregoing, Proposers may discuss this Solicitation with the Mayor or a member of the Gilbert Town Council, provided such meetings are scheduled through the Procurement Officer listed on this Solicitation, conducted in person at Gilbert Civic Center, Town Hall Administration Building, 50 East Civic Center Drive, Gilbert, Arizona 85296, and are posted as open meetings by the Town Clerk at least twenty-four (24) hours prior to the scheduled meetings. The posted notice shall identify the participants and the subject matter, as well as invite the public to participate. Form No. CIP4.1.1 PM/CM Notice of RFQ for CM@R Project Revised December 13, 2018 (jfb) This policy is intended to create a level playing field for all Proposers, assure that contracts are awarded in public, and protect the integrity of the selection process. Proposers who violate this policy shall be disqualified from participating in this Solicitation. GILBERT reserves the right to waive any irregularities in any submittal and to reject all submittals and re-advertise or cancel the project in its entirety, at its sole discretion. GILBERT, or its consultants and advisors, will not be responsible for any cost incurred by any firm submitting a SOQ or responding to this notice. Equal Opportunity: GILBERT is an equal opportunity employer. |
||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |