Similar Projects
Norwalk High School
New Construction - 328,407 SF
Conception
Rocky Hill, CT 06067

New Northeast Middle School
New Construction
Conception
Bristol, CT 06010

Renovation of Bulkeley High School
Renovation
Post-Bid
$149,000,000 to $154,000,000 est. value
Hartford, CT 06106

Burns Latino Studies Academy
Post-Bid
Hartford, CT 06106

Exterior Restoration and Related Work at Sedgwick Middle School (Phase 3)
Renovation - 3,200 SF
Results
West Hartford, CT 06107

South Windsor High School Facade Restoration
Renovation
Results
South Windsor, CT 06074

Construction of STEAM Education Center at Glastonbury High School
Renovation - 5,000 SF
Construction
Glastonbury, CT 06033

New Athletic Complex - Northwest Catholic High School
New Construction, Renovation, Infrastructure
Pending Verification
$10,000,000 CJ est. value
West Hartford, CT 06117

Athletic Complex Facilities Overhaul
Renovation
Conception
Southington, CT 06489

Owner's Project Manager Pre-Referendum Services
Renovation
Post-Bid
Plainville, CT 06062

Pool Locker Room Renovations at East Hartford High School
Renovation
Results
East Hartford, CT 06118

Windsor High School - HVAC
Renovation
Conception
$4,400,000 est. value
Windsor, CT 06095

Construction Manager at Risk
Renovation
Post-Bid
$135,532,699 est. value
Farmington, CT

School Vestibule Security Improvements
Results
$94,926 est. value
Newington, CT 06111

School Based Health Centers at Sunset Ridge and Woodland Schools
New Construction, Renovation
Post-Bid
East Hartford, CT 06108

Last Updated 07/26/2022 02:10 PM
Project Title

Northwest Catholic High School Master Plan

Physical Address View project details and contacts
City, State (County) Manchester, CT 06040   (Hartford County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for renovations to an existing school. Plans will include renovations to the science and technology classrooms and the addition of more communal space throughout central parts of the school. As of July 26 2022, this project is a study that is on hold. A timeline for construction has not been established.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents