Similar Projects
Additions and Renovations to John F. Kennedy Middle School
Renovation, Addition - 162,000 SF
Post-Bid
$71,800,000 est. value
Enfield, CT 06082

Renovation of Bulkeley High School
Renovation
Post-Bid
$149,000,000 to $154,000,000 est. value
Hartford, CT 06106

General Contractor Services
Results
Hartford, CT

Burns Latino Studies Academy
Results
Hartford, CT 06106

Glastonbury High School - Kitchen Code Violation Project
Renovation
Construction
Less than $1,298,200 est. value
Glastonbury, CT 06033

Additions and Renovations to Memorial Boulevard Intradistrict Arts Magnet School
Renovation, Addition, Demolition
Post-Bid
Bristol, CT 06010

Exterior Restoration and Related Work Phase II at Sedgwick Middle School
Renovation - 7,240 SF
Results
$150,000 est. value
West Hartford, CT 06107

Ellsworth Central Office Elevator Installation
Post-Bid
South Windsor, CT

Plainville High School Security Vestibule
Results
$72,000 est. value
Plainville, CT 06062

Additions and Renovations to Memorial Boulevard IntraDistrict Magnet School - Phase 2
Renovation, Addition
Post-Bid
Bristol, CT 06010

William H. Hall High School Restoration and Related Work - 2020 Phase
Results
West Hartford, CT

Pool Locker Room Renovations at East Hartford High School
Renovation
Post-Bid
East Hartford, CT 06118

Disaster Recovery Services
Results

School Vestibule Security Improvements
Post-Bid
Newington, CT 06111

Exterior Restoration and Related Work at Sedgwick Middle School (Phase 3)
Renovation - 3,200 SF
Results
West Hartford, CT 06107

Last Updated 07/27/2021 11:00 AM
Project Title

Norwalk High School

Physical Address View project details and contacts
City, State (County) Rocky Hill, CT 06067   (Hartford County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The new high school will accommodate new and improved educational spaces and technologies for approximately 2,000 students, including new classroom/lab spaces, gymnasium, kitchen/cafeteria, auditorium, natatorium, and parking. The existing science wing will remain and undergo a complete renovation. The new Norwalk High School is slated for completion by February 2027.

Details

328,407 SF - Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents