Similar Projects
On Call General Civil and Large Pipeline Contractor Services
Bidding
Clearwater, FL

Undergrounding Utilities Along Gulf Boulevard - Phase II
Bidding
Indian Rocks Beach, FL 34635

Maintenance and Cleaning of Retention Ponds, Ditches, Swales
Term Contract
Post-Bid
Less than $50,000 est. value
FL

360 La Hacienda Drive and 319 Harbor Drive Stormwater Improvements (Q076)
Results
Less than $174,200 est. value
Indian Rocks Beach, FL 34635

Roosevelt Stormwater Facility Improvements (Pid 003130A)
Results
$2,112,021 est. value
Clearwater, FL 33755

SAN Priority Area CIPP FY20
Results
Saint Petersburg, FL 33731

SAN Annual CIPP Lining FY20
Term Contract
Results
Saint Petersburg, FL 33731

Drainage Repair
Results
Less than $1,000,000 est. value

2021 Stormwater Pipe Cleaning
Term Contract
Results
Less than $500,000 est. value
Clearwater, FL 33758

2021 Stormwater Repairs
Term Contract
Results
$1,000,000 est. value
Clearwater, FL 33755

2021 Stormwater Pipe Lining Project
Term Contract
Results
Less than $1,000,000 est. value
Clearwater, FL 33755

2021 Underdrains
Results
Less than $350,000 est. value
Clearwater, FL 33755

Intent to Utilize City of Largo Contract for Sewer and Stormwater Rehabilitation
Term Contract
Results
Largo, FL 33770

Jail Perimeter Road Modification into Ditch Behind F-Wing
Results
Less than $1,165,522 est. value
Clearwater, FL 33762

Bartlett Park and 7th Street South Stormwater Improvements
Results
$2,234,000 est. value
Saint Petersburg, FL 33705

Reported 05/11/2021 12:00 AM
Project Title

W220 Boca Ciega Bay Stormwater Quality Improvement Project

Physical Address View project details and contacts
City, State (County) Redington Beach, FL 33708   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 04/09/21
Owner View project details and contacts
Architect View project details and contacts
Description

Installing infiltration systems and connecting to existing inlets and pipes within town owned rights of way. Consists of clearing and grubbing for the construction as shown on the drawings and disposal of material and debris resulting from the clearing and grubbing operations. All areas upon which concrete slabs, foundations or pavement is to be placed shall be cleared and grubbed. The Contractor is expected to visit the site of the work and determine for himself the extent of the clearing and grubbing necessary for his construction operations. The work also consists of clean-up of the construction site upon completion.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents