Similar Projects
Bank Repair Project - Pickering Creek at Church Road
Infrastructure
Bidding
$80,000 est. value
Chester Springs, PA

Rehabilitation of Highland Road Bridge Culvert
Infrastructure
Bidding
West Chester, PA

State Game Lands #183 Shooting Range Improvements
Post-Bid
Palmyra, PA

MS-4 Creek Restoration Project
Infrastructure
Post-Bid
Spring City, PA 19475

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Chesterville Road Drainage
Results
$40,390 est. value
Landenberg, PA 19347

Chesapeake Bay Watershed Pollution Reduction
Infrastructure
Post-Bid

Favinger Road Culvert Replacement Project
Results
Less than $98,000 est. value
Pottstown, PA 19465

Sinkhole Repairs
Infrastructure
Post-Bid

Kimberton Road Culvert Project
Results
$70,000 est. value
Kimberton, PA 19442

Chetwynd Road Drainage Mitigation Project
Infrastructure
Post-Bid
Paoli, PA 19301

Gunkle Spring Mill Retaining Wall Construction
Results
Less than $45,000 est. value
Frazer, PA 19355

Replacement of Culvert
Results
Kemblesville, PA

Jacqueline Drive Drainage Mitigation Project
Results
Paoli, PA 19301

Pheasant Run Road Culvert Replacement
Results
$90,000 est. value
West Chester, PA 19382

Reported 08/21/2021 12:00 AM
Project Title

Plum Run Stream Restoration Phase 3

Physical Address View project details and contacts
City, State (County) West Chester, PA 19382   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency - 07/26/21
Owner View project details and contacts
Architect View project details and contacts
Description

Work will involve streambank grading and stabilization, in-stream structures, erosion and sediment control measures, per guidelines in the design documents. Contractors must have and include in their bid packages a demonstrated experience in knowledge and construction of successful stream restoration projects incorporating fluvial geomorphology (FGM).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents