Similar Projects
Plum Run Stream Restoration Phase 3
Infrastructure
Bidding
West Chester, PA 19382

Bank Repair Project - Pickering Creek at Church Road
Infrastructure
Bidding
$80,000 est. value
Chester Springs, PA

State Game Lands #183 Shooting Range Improvements
Post-Bid
Palmyra, PA

MS-4 Creek Restoration Project
Infrastructure
Post-Bid
Spring City, PA 19475

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Chesterville Road Drainage
Results
$40,390 est. value
Landenberg, PA 19347

Chesapeake Bay Watershed Pollution Reduction
Infrastructure
Post-Bid

Favinger Road Culvert Replacement Project
Results
Less than $98,000 est. value
Pottstown, PA 19465

Sinkhole Repairs
Infrastructure
Post-Bid

Kimberton Road Culvert Project
Results
$70,000 est. value
Kimberton, PA 19442

Sinkhole Repairs
Infrastructure
Post-Bid

Gunkle Spring Mill Retaining Wall Construction
Results
Less than $45,000 est. value
Frazer, PA 19355

Replacement of Culvert
Results
Kemblesville, PA

Jacqueline Drive Drainage Mitigation Project
Results
Paoli, PA 19301

Pheasant Run Road Culvert Replacement
Results
$90,000 est. value
West Chester, PA 19382

Reported 08/13/2021 12:00 AM
Project Title

Chetwynd Road Drainage Mitigation Project

Physical Address View project details and contacts
City, State (County) Paoli, PA 19301   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Chetwynd Rd Drainage Mitigation Project, Located at 21 & 23 Chetwynd Rd, Willistown Twp. The project generally consists of: 1.Restoring a severely eroded drainage swale (approx. 120 ft x 25 ft wide plus other transition grading totaling 2.Install a river rock or rip rap plunge pool around an existing inlet transition grading. 3.Restore new swale and all disturbed areas with topsoil, fertilizer, and SOD (approx. 7000 sf). 4.Reconstruct existing driveway with a new berm and replace approx. 14 LF x 4 ft of existing sidewalk

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents