Similar Projects
Granada Pedestrian Bridge - B-000005 - City of Madera
New Construction, Infrastructure
Conception
$1,725,000 CJ est. value
Madera, CA 93637

Granada Pedestrian Bridge - B-000005 - City of Madera
New Construction, Infrastructure
Conception
$1,725,000 CJ est. value
Madera, CA 93637

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Water System Improvement Project Test Well
Infrastructure
Bidding
$200,000 CJ est. value
Oakhurst, CA 93644

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Cold Plane AC, Place RHMA-G and HMA (Type A)
Infrastructure
Post-Bid
$2,150,000 est. value
CA

CA FLAP MAD CR26(1) ET AL Avenue 26 and Road 29
Infrastructure, Alteration
Results
$16,000,000 to $21,000,000 est. value
Madera, CA

RHMA and HMA Paving, Modify Signal and Lighting Systems
Infrastructure
Results
$1,470,000 est. value
Madera, CA

Sunset Apartments
Demolition, New Construction, Infrastructure, Build-out - 40,000 SF
Pending Verification
$5,500,000 CJ est. value
Madera, CA 93637

Sunset Apartments
Demolition, New Construction, Infrastructure, Build-out - 40,000 SF
Pending Verification
$5,500,000 CJ est. value
Madera, CA 93637

Bike/Ped Path, FRT-Cleveland Avenue - PK-00056 - City of Madera
Infrastructure
Conception
$310,000 CJ est. value
Madera, CA 93637

CA Flap 03S11(1) Reds Meadow Road
Term Contract
Post-Bid
CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Foxglove Shopping Center - Madera 20 Acres
New Construction, Infrastructure - 191,500 SF
Pending Verification
$40,000,000 CJ est. value
Madera, CA 93637

Minor B Small Business Remove and Replace HMA
Infrastructure
Post-Bid
$221,000 est. value
CA

Last Updated 01/23/2023 11:04 PM
Project Title

Norris Creek Bridge

Physical Address View project details and contacts
City, State (County) Oakhurst, CA 93644   (Madera County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,464,729 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Jan 23, 2023 Contract Award Number: 6982AF23C000011 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: GZZVJ9VCEMM8 Contractor Awarded Name: TAYLOR JANE CONSTRUCTION LP Contractor Awarded Address: Nipomo, CA 93444-9131 USA Base and All Options Value (Total Contract Value): $1464728.76 Goals for Minority Participation for Each Trade 23.6% Goals for Female Participation for Each Trade 6.9% Solicitation Number - 6982AF22B000037 CA ERFO SIERRA NF 05S07(1) - NORRIS CREEK BRIDGE PROJECT DESCRIPTION AND LOCATION: The Sierra National Forest (SNF) sustained significant damage to transportation facilities, including bridges during the 2020 fire season. The project site is located approximately 37.2 miles northeast of Oakhurst, CA on Forest Service Route 05S007 (Beasore Road) within Sierra National Forest in Madera County, CA. The original bridge was a one lane, two-way traffic single span structure at a 15-degree skew. It had an overall bridge length of 37 feet, roadway width (curb to curb) of 14.1 ft, and deck width (outside to outside) of 15.4 ft. SCOPE OF THE WORK: The purpose of the project is to replace the Norris Creek Bridge over Norris Creek within Sierra National Forest in Madera County, California. The bridge was completely damaged by fire in 2020 and will be fully replaced with a prefabricated steel bridge. A two-lane, 70-ft x 24-ft proposed structure is anticipated. The roadway approaches will be reconstructed for up to 150 feet on either end of the bridges. The bridge and a short section of the roadway approaches will be asphalt overlaid to match the existing roadway section. Bridge rail and guardrail with terminals will be included. Items worth noting: The work will be listed within a single Schedule (Schedule A) and no options are proposed. Adjacent segments of Forest Route 05S007 will remain closed during construction and can be used for contractor staging and storage. Access is to both sides of the bridge is possible by an approximate 7.5-mile detour. Deep foundations (micro-piles or drilled shafts) are anticipated PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 8500 CUYD of Excavation/Embankment Construction 250 CUYD of Riprap 300 TON of Roadway Aggregate 70-ft x 256-ft of Prefabricated Steel Bridge 200 TON of Asphalt Pavement 150 LNFT of Guardrail, including terminals 80 hours of Equipment Hours 40 hours of Labor Hours ESITMATED MAGNITUDE: Between $700,000 and $2,000,000 TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. MDT ON OCTOBER 25, 2022 Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at https://sam.gov FAX Number to submit modifications to bids for this project is (720) 963-3360 Email Address to submit modifications to bids for this project is cflcontracts@dot.gov NOTICE TO BIDDERS A-iii Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data. For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive. II. POST AWARD INFORMATION CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor. Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, servicedisabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency Site Visit (Construction). (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract B-11 awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. (b) Site visits may be arranged during normal duty hours by contacting: No organized site visit will be held Commencement, Prosecution, and Completion of Work. (APR 1984) Alternate I (APR 1984) The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than {Refer to Subsection 108.01 of the SCRs}. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by January 9, 2023. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer Schedule at least 2 non-work days out of every 14 calendar days. The selected non-work days do not need to be consecutive, but they must be scheduled. Notify the CO at least 2 weeks before changing the scheduled days off. The CO may grant written approval for exemptions to scheduled days off for specific project operations and for periods of limited duration. E-11 CA ERFO SIERRA NF 05S07(1) Norris Creek Bridge Add the following: The CO will issue a Notice to Proceed before commencement of any work. The contract completion date is October 6, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents