Similar Projects
Berwyn East Place - Livingston Avenue Senior
New Construction - 38,400 SF
Conception
$13,759,006 est. value
Columbus, OH 43227

100 Oakland Apartment Building
New Construction - 3,000 SF
Conception
$500,000 to $1,000,000 CJ est. value
Columbus, OH 43201

High Street Mixed-Use Development
Renovation - 130,013 SF
Design
$14,300,000 est. value
Columbus, OH 43215

Bridge Park - Block F Podium Apartment Building
New Construction - 214,000 SF
Design
$10,000,000 CJ est. value
Dublin, OH 43017

Jaeger Square Mixed-Use Apartments
New Construction - 340,000 SF
Post-Bid
Columbus, OH 43206

Lucas Lofts 1
New Construction - 14,772 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Columbus, OH 43215

Arlington Gateway
New Construction, Renovation - 471,705 SF
Construction
$100,000,000 est. value
Upper Arlington, OH 43221

North Fourth Street Building
New Construction, Renovation
Construction
Columbus, OH 43085

The Reserve at Maryland
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
Columbus, OH 43203

Michigan Avenue Apartments
New Construction, Renovation, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Columbus, OH 43215

The Lusso - Site 1
New Construction - 15,000 SF
Conception
Columbus, OH 43201

Golden Bear Redevelopment
New Construction, Build-Out - 250,847 SF
Design
$56,000,000 est. value
Upper Arlington, OH 43221

The SW on Hamilton - Apartment Community
New Construction - 472,608 SF
Post-Bid
$10,000,000 CJ est. value
Westerville, OH 43081

The Adelphi Quarter
New Construction - 114,000 SF
Construction
$14,000,000 to $20,000,000 est. value
Columbus, OH 43203

Beechwood Drive Multi Residential
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Columbus, OH 43230

Last Updated 10/28/2022 01:08 PM
Project Title

Crescent at Central Park

Physical Address View project details and contacts
City, State (County) Gahanna, OH 43230   (Franklin County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $91,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 240 apartment units, a clubhouse, and a pool. As of October 28, 2022 the project is under consideration by the city council. This project has been approved by the Gahanna Planning Commission. Information regarding a general contractor and the method of selection has not been disclosed. A firm construction timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents