Similar Projects
Highpoint
New Construction - 588,000 SF
Conception
Stuart, FL 34997

Watercress Cove
New Construction
Conception
North Port, FL

Drivers Club Miami
New Construction - 209,100 SF
Design
$100,000,000 est. value
Miami Gardens, FL

Nolte Road Commercial Park
New Construction
Design
Saint Cloud, FL 34772

Mechanical Site Prep of Approximately 135 Acres
Bidding
FL

Cordova Palms - Site Only
New Construction
Post-Bid
Saint Augustine, FL

Lamb Tail Lane West Expansion
New Construction
Post-Bid
Jacksonville, FL 32256

Job Order Contracting Services for Civil Site Work
Results
Tampa, FL 33602

Unsolicited Proposal for the Development, Operation and Maintenance of a Soccer Complex and Other Facilities
Results
Miramar, FL

Morgan's Cove Assisted Living - Site Work
Construction
$35,000,000 est. value
Saint Augustine, FL

KOA Campground
New Construction
Construction
$3,384,744 est. value
Fort Pierce, FL 34981

11134 New Kings Road RV Park
New Construction
Pending Verification
Jacksonville, FL 32219

Pace Commons
New Construction
Pending Verification
Pace, FL

Waterset By Newland
New Construction
Conception
Apollo Beach, FL 33572

Oviedo on the Park - Lot 4 - Sitework
New Construction
Design
Oviedo, FL 32765

Reported 01/31/2020 12:00 AM
Project Title

12.2 Acre Land Clearing and Related Work Project at Keystone Heights Airport

Physical Address View project details and contacts
City, State (County) Starke, FL   (Bradford County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The specific intent of this Request for Proposal is to de-stump, level and stabilize approximately 12.2 acres of recently cleared land at the Keystone Heights Airport. The desired future condition is for the project area to be clear of debris and tree stumps, minor slope grading to mowable slopes, small concrete pads removed, and the ground seeded with a combination of annual and perennial grass seed blend. The seed blend will need to be incorporated into the soil for proper germination. The existing and remaining tree debris from an August 2019 clearing event can be piled burned or hauled offsite. Raking of the 12.2 acre project is anticipated and warranted for future land use. No water or electrical services are active within the project area, except within the narrow row along Airport Road. A subsurface utilities locate and marking will be required before any site work is performed. Site map can be obtained from airport staff.

Details

Division 31 - Earthwork, Clearing and Grubbing.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading, Turf and Grasses, Seeding.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents