Similar Projects
Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

CBJTC Precinct Road North Culvert Replacement
Results
Less than $500,000 est. value
Starke, FL 32091

CBJTC East Bay Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

CBJTC Gulfport Street Washout Repair
Results
Less than $420,000 est. value
Starke, FL 32091

Washington County Concrete Drainage Features
Post-Bid
Chipley, FL 32428

CBJTC Mosley Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Construction Services for Poitras East Community Development District
Post-Bid
FL

CBJTC Prison Camp Road Washout Repair
Results
Less than $300,000 est. value
Starke, FL 32091

Kaicasa - Concrete Box Culvert
Post-Bid
Immokalee, FL

Seawall Repair
Results
Everglades, FL

10/1366DN EGLIN NON-POINT SOURCE PROJECT OKALOOSA / W
Post-Bid
Eglin AFB, FL

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Sweetwater Drainage Improvements: Phase 8A
Post-Bid
Sweetwater, FL 33174

Last Updated 06/08/2020 11:14 AM
Project Title

CBJTC North Tank Trail Emergency Repair

Physical Address View project details and contacts
City, State (County) Starke, FL   (Bradford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Clear all trees brush and debris from a 300’ section of road, approximately 16’ each side. Furnish and install 12” thick rip rap with fabric filter underlayment approximately 300’ x 12’ in center of road bed. Concrete waffles with center valley to be installed on top of 12” rip rap. Furnish and install 18” thick rip rap with fabric filter underlayment a minimum of 3’along each side of new road bed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts, Concrete Culverts, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents