Similar Projects
Park Vista at El Tesoro Lift Station Facilities
New Construction
Bidding
Houston, TX 77083

Lift Station Pump Addition
Addition
Bidding
Katy, TX 77493

Golden Acres WWTP Influent Lift Station
Post-Bid
Pasadena, TX 77506

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Fountain View Regional LS Construction and Abandonment of Westheimer No. 1 LS
Results
$21,957,065 est. value
Houston, TX

Force Main R/R For Lift Stations
Results
Less than $10,229,101 est. value
Houston, TX 77000

Lift Station and Off-Site Utilities to Serve Villages of Pine Ridge
New Construction
Bidding
TX

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

Lift Stations No. 16, 17, 18, and 21 Improvements
Results
Clear Lake City, TX 77058

Lift Station Number 3 Rehabilitation
Renovation
Bidding
TX

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Construction of Lift Station No. 2 Rehabilitation
Results
TX

Nhcrwa State Highway 249 Regional Pump Station Project 24C
New Construction
Bidding
$85,000,000 to $95,000,000 est. value
TX

Lift Station Renewal and Replacement
Results
Less than $5,035,965 est. value
Houston, TX 77000

Clear Creek Lift Station Expansion
Results
TX

Last Updated 07/15/2021 05:36 AM
Project Title

Wastewater Treatment Plant Lift Station - Rehabilitation

Physical Address View project details and contacts
City, State (County) Spring, TX 77389   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope shall include the installation of a fourth (4th) 475 gpm submersible pump with all associated piping and appurtenances, lift station pipe replacement and recoating, safety improvements, control panel replacement and the installation of a new 250 KW diesel generator.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents