Similar Projects
22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

9Th Avenue South East Improvements from 3rd Road Street to Railroad
Conception
$200,000 est. value
Cedar Rapids, IA 52407

Ingleside Drive South West Pavement Improvements
Design
$250,000 est. value
Cedar Rapids, IA 52404

Cedar River Safety and Recreational River lmprovements Phase I - City of Cedar Falls
Infrastructure
Design
$4,831,000 est. value
Cedar Falls, IA

ISU Extension Office - Spencer
New Construction, Infrastructure
Bidding
$950,000 CJ est. value
Spencer, IA 51301

County Road Improvements
Infrastructure
Post-Bid
IA

Valley Junction Alleys Phase 6
Infrastructure
Post-Bid
West Des Moines, IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

Edgewood Water Main Loop
Infrastructure
Results
Less than $340,000 est. value
Webster City, IA

15th Avenue South West from 4th Street to C Street
Conception
$1,707,000 est. value
Cedar Rapids, IA 52404

Hamilton Drainage Area Improvements - E304PW99 SM133 - City Of Des Moines
Infrastructure
Design
$26,470,000 CJ est. value
Des Moines, IA 50309

2021/2022 Sealcoat Work
Infrastructure
Post-Bid
$60,000 est. value
Maquoketa, IA

South Second Street Reconstruction
Infrastructure
Results
$105,210 est. value
Kimballton, IA 51543

Blairs Ferry Road Improvements and 18Th Avenue Extension
Conception
$333,000 est. value
Cedar Rapids, IA 52407

Parking Lot B Reconstruction
Infrastructure
Design
$600,000 CJ est. value
Storm Lake, IA 50588

Last Updated 08/03/2022 06:05 PM
Project Title

2022 Atkins PCC Street Repairs Project

Physical Address View project details and contacts
City, State (County) Atkins, IA 52206   (Benton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bids were rejected. will rebid at later date. 2022 Atkins PCC Street Repairs Project - This project involves patching and repairing PCC streets within the City of Atkins. This include full depth pavement patches, manhole boxout replacements and any associated construction items. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. Said bond shall be issued by a responsible surety approved by City of Atkins and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless City of Atkins from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two years from and after acceptance of the contract. The guaranteed maintenance period for new paving shall be four years. The City of Atkins, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Contractor shall fully complete the project by (no later than) October 28, 2022. Should the contractor fail to complete the work in this timeframe, liquidated damages of five hundred ($500) per calendar day will be assessed for work not completed within the designated contract term. The City of Atkins does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the jurisdiction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents