Similar Projects
Redevelopment of St. Elizabeths East Campus-13th Street SE Infrastructure Improvements
Infrastructure
Post-Bid
Washington, DC 20032

Beech Grove Maintenance Yard Paving Improvements
Term Contract
Post-Bid
Washington, DC

Asphalt and Cement Services
Infrastructure
Post-Bid
Washington, DC

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Southern Avenue from Barnaby Road, South East to UMC Campus
Post-Bid
Washington, DC 20009

Rehabilitation of 16th Street, NW Bridge Over Piney Branch Parkway (Bridge No. 0022)
Post-Bid
Washington, DC 20260

15th Street Protected Bike Lane
Infrastructure
Design
Washington, DC 20544

Martin Luther King Jr Avenue SE Phase II
Infrastructure
Pending Verification
Washington, DC 20544

Florida Avenue, NE from 2nd Street, NE to H Street, NE
Infrastructure
Post-Bid
Washington, DC 20002

Federal Aid Pavement Restoration National Highway Performance Program (NHHP) Streets
Term Contract, Infrastructure
Post-Bid
Washington, DC

Wheeler Road Mulitmodal Safety & Access
Infrastructure
Pending Verification
Washington, DC 20032

Benning Road Bridges & Transportation
Infrastructure
Design
Washington, DC 20019

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Redevelopment of St. Elizabeths East Campus - Pecan Street Infrastructure Improvements
Results
Washington, DC 20032

Reconstruction of Florida Avenue, and 9th Street, NW from T Street to Barry Place, NW
Post-Bid
Washington, DC 20009

Last Updated 01/27/2022 08:31 AM
Project Title

East Capitol Street Safety & Mobility

Physical Address View project details and contacts
City, State (County) DC   (District of Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Obtained from a credible source, Awaiting verification
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide upgrades to intersections and streets to improve safety and access for all users of East Capitol Street, including the Benning Road intersection, the Central Avenue intersection, the Benning Stoddert Recreation Center, and the Maryland border at Southern Avenue. The total length of this segment of East Capitol Street from Burns Street at its west terminus to Southern Avenue at its east terminus is about 2.1 miles. Key improvements include over four miles of designated bike lanes including one mile of protected bike lanes, floating bus stops offset from the curb, curb extensions to enhance visibility, enhanced traffic signal timing for vehicles and pedestrians, high-visibility crosswalks, HAWK (High-Intensity Activated crosswalk) beacons, full time designated parking, and safer geometric reconfigurations of intersections.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents