Similar Projects
(Idiq) Multiple Award Task Order Contracts (Matoc) For Vegetation Management Services On The Daniel Boone National Forest In Kentucky
Term Contract
Design

Oakbrook Drive Landscaping
Post-Bid
KY

Snow Removal and Road De-Icing Services
Term Contract, Alteration
Post-Bid
KY

Blasting And Coating Of Clarifiers
Results
Petersburg, KY 41080

Standby Maintenance & Emergency Services
Term Contract
Results
Fort Wright, KY

Material Bid
Term Contract
Post-Bid
Florence, KY

Guardrail and Joint/Crack Sealing
Alteration
Results
Burlington, KY

Lawn Care, Mulching & Spraying
Term Contract
Post-Bid
Florence, KY

Asbestos Abatement at Boone County High School
Renovation, Alteration
Results
Florence, KY 41042

Pest Mangement Services
Post-Bid
Covington, Florence, Fort Campbell, KY 41042

City Facilities Dumpster Improvements
Renovation
Results
$107,000 est. value
Florence, KY

Asbestos Abatement
Post-Bid
Florence, KY 41042

BCPWD 22/23-12 Joint/Crack Sealing
Term Contract, Alteration
Results
Burlington, KY

Code Enforcement Mowing Services
Post-Bid
KY

BCPWD 22/23-07 Concrete Pavement Replacement
Term Contract, Infrastructure, Alteration
Results
Burlington, KY

Reported 04/29/2022 12:00 AM
Project Title

BCPWD 22/23-13 Mowing, Trimming, and Litter Removal

Physical Address View project details and contacts
City, State (County) Burlington, KY   (Boone County)
Category(s) Single Trades
Sub-Category(s) Environmental, Landscaping/Irrigation, Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. Unit bid cost shall be based on three (3) complete mowing cycles for county roads; And five (5) complete mowing cycles on KYTC Roads. Tentative schedule for County Road Mowing Cycles: 1. 1st Cycle – Last week of August 2. 2nd Cycle – Third week of October 3. 3rd Cycle – Third week of May Note: the five (5) mowing cycles for KYTC Roads shall be completed in coordination with and at the same time as the Boone County Interstate Highway mowing cycles on KYTC R/W. B. Number of mowing cycles shall be at the discretion of Boone County Public Works. C. Contractor responsible for all utility locations, needed signage and traffic control per Manual on Uniform Traffic Control Devices (MUTCD) current addition. D. Contractor shall be responsible for removal of any vegetation or debris thrown onto roadway or shoulder by mowing operation. The term of this contract shall be for the Fiscal Year beginning July 1, 2022 to June 30, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents