Similar Projects
Route 1 Elementary School - Fairfax County Public Schools
New Construction, Infrastructure
Conception
$21,169,000 CJ est. value
Mount Vernon, VA 22309

Silver Line Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$39,574,000 CJ est. value
Fairfax, VA 22030

Dunn Loring Elementary School - Fairfax County
New Construction, Infrastructure - 118,000 SF
Design
$35,332,424 CJ est. value
Vienna, VA 22182

Crossfield Elementary School - Fairfax County
Addition, Renovation, Infrastructure
Design
$32,586,040 CJ est. value
Herndon, VA 20171

City Hall Pond Retrofit
Infrastructure
Bidding
$200,000 CJ est. value
Franconia, VA 22315

2023 Latex Modified - Secondary
Infrastructure
Bidding
$1,684,000 CJ est. value
Vienna, VA 22182

RFQ D/B - Defense Logistics Agency Overwatch Booths and Dining Patio Pavers
New Construction, Infrastructure
Post-Bid
$1,942,623 CJ est. value
Fort Belvoir, VA 22060

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Holmes Run Pump Station Rehabilitation
Infrastructure, Renovation
Results
$15,289,000 CJ est. value
Falls Church, VA 22044

Dulles Toll Road Crossing at Innovation Center
Infrastructure, Renovation
Results
$5,300,000 CJ est. value
Herndon, VA 20171

FDLLC Fairfax VA WAWA
Renovation, Demolition
Construction
Fairfax, VA 22031

Brown's Fairfax Mazda
New Construction, Demolition - 103,064 SF
Construction
Fairfax, VA 22030

Sheehy Automotive - Loisdale / Springfield
New Construction, Infrastructure - 52,000 SF
Pending Verification
$30,000,000 CJ est. value
Springfield, VA 22150

Somos at Tyson Multi-Residential
Demolition, New Construction, Infrastructure - 465,000 SF
Pending Verification
$115,000,000 CJ est. value
Tysons, VA 22102

Cub Run Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$36,519,000 CJ est. value
Centreville, VA 20120

Last Updated 11/07/2022 03:07 PM
Project Title

Willard Maintenance Facility

Physical Address View project details and contacts
City, State (County) Chantilly, VA 20151   (Fairfax County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $46,427,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The Willard Maintenance Facility project is located at 14925 Willard Road, Chantilly, Virginia 20151. The work includes the construction of a warehouse, meter shop, fleet and distribution facilities, fueling station, vehicle wash, covered parking and materials storage and is described in additional detail in Section II of the Prequalification Procedure and Instructions. The Willard Maintenance Facility is located at 14925 Willard Road, Chantilly, Virginia and will be constructed on an approximately 10.8-acre site. The project includes significant clearing and grading, installation of retaining walls, paving, parking, extensive landscaping, stormwater management, and new sanitary and water utilities installed to serve the site. Installation of dry utilities is also included in this contract. A 65,000 SF primarily one-story building will be constructed as part of the project to include shop and vehicle bays, a warehouse to house water distribution materials and a vehicle wash. Approximately 9,000 SF of the building will be two stories to include administrative/support and mezzanine areas. The building will be primarily steel framed construction with load bearing CMU walls and a brick and cast stone façade. The Contract for this project is anticipated to be advertised for bid in May 2022 with bid opening in June 2022. The Contract Award date is projected for July 2022, with an anticipated construction Notice to Proceed date of August 2022. The overall construction duration is expected to be approximately two years. These are estimated dates and durations and are subject to change. Documents are made available to prequalified contractors only.

Details

74,000 SF - 3 Stories Above Grade, 74,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents