Similar Projects
10th Street SE at Hull Avenue Storm Sewer Improvements
Conception
$1,846,900 est. value
Cedar Rapids, IA 52407

Storm Sewer Improvements
Conception
$2,000,000 est. value
Cedar Rapids, IA

Lower City Park and Kimball Road Storm Sewer Improvement
Infrastructure
Bidding
$250,000 est. value
Iowa City, IA 52242

128th Street and Hickman Road
Infrastructure
Bidding
Urbandale, IA 50322

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Post-Bid
$510,000 est. value
Prairie City, IA 50228

Ludland Drive Street Repair
Post-Bid
$64,079 est. value
Manchester, IA

Western Ingersoll Run Sewer Separation Phase 2
Alteration
Results
$6,750,000 est. value
Des Moines, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

11th Avenue Storm Sewer
Infrastructure
Bidding
$225,000 est. value
Hiawatha, IA 52233

Valley View Park North Loop Road Extension Project
Infrastructure
Post-Bid
West Des Moines, IA

11th Avenue South East and 5th Street Sanitary Sewer and Storm Sewer Improvements
Conception
$110,000 est. value
Cedar Rapids, IA 52407

Beer Creek Storm Sewer Repair
Infrastructure
Bidding
$44,000 est. value
Iowa City, IA 52245

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Post-Bid
West Des Moines, IA 50266

Sanitary Sewer South of East Avenue/ West of 80Th Street
Conception
$830,000 est. value
Cedar Rapids, IA 52407

High Street Storm Sewer Improvements
Infrastructure
Post-Bid
West Des Moines, IA

Last Updated 06/07/2021 05:17 PM
Project Title

Altoona Heritage Homes Storm Water Improvements - Phase 3

Physical Address View project details and contacts
City, State (County) Altoona, IA 50009   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $534,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes all materials, equipment, and labor necessary for construction of 15” diameter storm sewers by trenched construction and 8” diameter footing drain collector sewers by trenchless construction. The location of improvements is primarily along 15th Street SE from 3rd Avenue SE to 6th Avenue SE, along 5th Avenue SE from 15th Street SE to 13th Street SE, and along 6th Avenue SE from 15th Street SE to 13th Street SE. Work includes approximately 400 LF of 15” storm sewer, approximately 1,900 LF of 8” footing drain collector, and approximately 1,200 LF of 2” footing drain service stubs, and related work including manholes, intakes, connections; pavement, driveway, and sidewalk removal and replacement; erosion control, surface restoration and miscellaneous associated work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents