Similar Projects
Standby Generator
Bidding
$105,826 est. value
Bellingham, MA 02019

DDS - Wrentham Development Center - Solar Panel Replacement
Bidding
$650,000 est. value
Wrentham, MA 02093

Fens Gatehouse Repurposing - Sub-Bids
Sub-Bidding
$1,155,996 est. value
Boston, MA

Demolition of Existing Generator, Gas Piping, and HVAC Equipment
Sub-Bidding
Less than $185,000 est. value
Bellingham, MA

APC Galaxy 3500 Battery Replacement and Service Maintenance
Term Contract
Post-Bid
Needham, MA 02492

Annual HV-Filter Preventative Maintenance Service
Term Contract
Post-Bid
Brookline, MA 02445

Substation 495 Substation and Transmission Electrical Construction
Results
Less than $400,000 est. value
Norwood, MA 02062

Bolivar Aquatic Complex - Filed Sub Bid
Results
Less than $4,800,000 est. value
Canton, MA

Controller Replacement and Associated Work on the Wellesley Hills Campus
Bidding
$75,000 est. value
Wellesley, MA

Padmount Transformers
Post-Bid
Braintree, MA

Bathroom Mechanical Exhaust Fan Installation - Filed Sub-Bids
Results
Less than $215,676 est. value
Brookline, MA 02446

Maintenance, to Electrical and Mechanical Equipment
Bidding
Boston, MA

Water and Sewer Department Preventative Maintenance and OnCall Generator Services Contract
Post-Bid
Less than $45,000 est. value
Franklin, MA

Three Phase Padmount Transformers
Results
Wellesley, MA 02481

DRM 2018-46 2 - Conduit Installation
Bidding
$250,000 est. value
Norfolk, MA 02071

Reported 08/21/2020 12:00 AM
Project Title

Leonard Road and Chandler Drive Pump Station Improvement - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Walpole, MA 02081   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $476,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Required. The scope of work includes selective demolition and the furnishing and installation of new suction lift wastewater pumps, pre-fabricated fiberglass above grade building, bypass pump connection, standby generator, instrumentation and controls, and other improvements and appurtenant site work.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents