Similar Projects
208th Street East/Mountain Highway Extension - Pierce County
Infrastructure
Conception
$10,598,000 est. value
Spanaway, WA 98387

Burnham Drive Apartments
New Construction, Infrastructure
Design
$30,000,000 est. value
Gig Harbor, WA 98332

SR 302/Victor Creek - Remove Fish Barrier
Infrastructure
Design
$2,806,000 CJ est. value
Gig Harbor, WA 98332

Bonney Lake 950 Zone Tank and 950 / 1010 Zone Pump Station
New Construction, Infrastructure
Bidding
$8,900,000 CJ est. value
Tacoma, WA 98405

Bonney Lake 950 Zone Tank and 950 / 1010 Zone Pump Station
New Construction, Infrastructure
Bidding
$8,900,000 CJ est. value
Tacoma, WA 98405

Oil Water Separators Maintenance Contract
Infrastructure
Post-Bid
Tacoma, WA 98433

VA American Lake Phase 2 Site Development
Demolition, Term Contract, Infrastructure, Alteration
Post-Bid
$10,000,000 to $25,000,000 est. value
Tacoma, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Results
$350,000 est. value
Tacoma, WA 98402

SR 302/Purdy Bridge - Bridge Rehabilitation
Infrastructure, Renovation
Design
$5,599,000 CJ est. value
Gig Harbor, WA 98332

Potable Water Line Replacement - Clover Park Technical College
Infrastructure
Bidding
$865,000 CJ est. value
Lakewood, WA 98499

Parking / Pedestrian Site Lighting and Stormwater Management Items For Vaal Ph 2A At Jblm, Wa
Infrastructure
Post-Bid
Lakewood, WA

Mcmillin Reservoir Onsite Septic System Holding Tank Construction for Comfort Station
Infrastructure
Results
WA 98374

Point Ruston Public Market
New Construction, Infrastructure - 500,000 SF
Design
$1,400,000,000 CJ est. value
Ruston, WA 98407

Parcel 15 (Portac) Cleanup Phase 1
Infrastructure
Bidding
$2,380,000 CJ est. value
Tacoma, WA 98421

Last Updated 07/29/2022 08:37 AM
Project Title

Turner Brewer Septic and WPS

Physical Address View project details and contacts
City, State (County) Roy, WA 98580   (Pierce County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected December 2021
Bids Due View project details and contacts
Estimated Value $61,904 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

*Contract Award Date: Dec 13, 2021 Contract Award Number: 75H70122P00004 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 622182442 Contractor Awarded Unique Entity ID (SAM): R728AKA8J9C7 Contractor Awarded Name: A-Action Group Utilities Inc Contractor Awarded Address: Olympia, WA 98501-9701 USA Base and All Options Value (Total Contract Value): $61904.00 Work is to be completed to a private home, under the jurisdiction of Pierce County. The contractor must review site conditions, and report any concerns or discrepancies to the Contracting Officer's Representative (COR) in writing prior to beginning construction. The design is detailed in the County Approved Design, Attachment 1. In accordance with the Design, the contractor must: D.1. Work Requirements: The septic system and water pressure system installation shall include: D.1.1. Mobilization and demobilization. D.1.2. Installation of approximately 15 linear feet of 4" SCH 35 PVC solid sewer pipe. D.1.3. Installation of two underground double-sweep cleanouts. D.1.4. Installation of approximately 440 ft of sewer force main (2" PVC, SCH 40). D.1.5. Installation of a 1,500-gallon 2-compartment concrete septic tank with effluent filter, for main house. D.1.6. Installation of a 1,900-gallon concrete pump tank and controls (Liberty FL70 Series 3/4 HP submersible effluent pump or equal, for main house. D.1.7. Installation of a 1250-gallon 2-compartment septic tank with pump and controls (Orenco PF5005 1/2 HP submersible effluent pump or equal), for ADU. D.1.8. Installation of a valve box and 1.5" PVC SCH 40 manifold. D.1.9. Installation of approximately 240 linear feet of sand-lined trench drainfield with 1" PVC SCH 40 lateral pipes. D.1.10. Installation of a 1 HP submersible well pump (Goulds 10GS10 or equal) and controls D.1.11. Installation of approximately 90 linear feet of 1.25" SCH 120 PVC drop pipe and submersible cable. D.1.12. Installation of a pitless adapter and well cap. D.1.13. Installation of two 81-gallon water pressure tanks (Amtrol WX255 or equal) and shared pressure switch. D.1.14. Installation of approximately 180 linear feet of 1.25" SCH 40 PVC water service line to ADU. D.1.15. Installation of approximately 280 linear feet of 1.5" SCH 40 PVC water service line to main Home. Magnitude of Construction is: $25,000 to $100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project no . 0217362013

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents