Similar Projects
Last Updated | 07/29/2022 08:37 AM |
Project Title | Turner Brewer Septic and WPS |
Physical Address | View project details and contacts |
City, State (County) | Roy, WA 98580 (Pierce County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected December 2021 |
Bids Due | View project details and contacts |
Estimated Value | $61,904 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *Contract Award Date: Dec 13, 2021 Contract Award Number: 75H70122P00004 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 622182442 Contractor Awarded Unique Entity ID (SAM): R728AKA8J9C7 Contractor Awarded Name: A-Action Group Utilities Inc Contractor Awarded Address: Olympia, WA 98501-9701 USA Base and All Options Value (Total Contract Value): $61904.00 Work is to be completed to a private home, under the jurisdiction of Pierce County. The contractor must review site conditions, and report any concerns or discrepancies to the Contracting Officer's Representative (COR) in writing prior to beginning construction. The design is detailed in the County Approved Design, Attachment 1. In accordance with the Design, the contractor must: D.1. Work Requirements: The septic system and water pressure system installation shall include: D.1.1. Mobilization and demobilization. D.1.2. Installation of approximately 15 linear feet of 4" SCH 35 PVC solid sewer pipe. D.1.3. Installation of two underground double-sweep cleanouts. D.1.4. Installation of approximately 440 ft of sewer force main (2" PVC, SCH 40). D.1.5. Installation of a 1,500-gallon 2-compartment concrete septic tank with effluent filter, for main house. D.1.6. Installation of a 1,900-gallon concrete pump tank and controls (Liberty FL70 Series 3/4 HP submersible effluent pump or equal, for main house. D.1.7. Installation of a 1250-gallon 2-compartment septic tank with pump and controls (Orenco PF5005 1/2 HP submersible effluent pump or equal), for ADU. D.1.8. Installation of a valve box and 1.5" PVC SCH 40 manifold. D.1.9. Installation of approximately 240 linear feet of sand-lined trench drainfield with 1" PVC SCH 40 lateral pipes. D.1.10. Installation of a 1 HP submersible well pump (Goulds 10GS10 or equal) and controls D.1.11. Installation of approximately 90 linear feet of 1.25" SCH 120 PVC drop pipe and submersible cable. D.1.12. Installation of a pitless adapter and well cap. D.1.13. Installation of two 81-gallon water pressure tanks (Amtrol WX255 or equal) and shared pressure switch. D.1.14. Installation of approximately 180 linear feet of 1.25" SCH 40 PVC water service line to ADU. D.1.15. Installation of approximately 280 linear feet of 1.5" SCH 40 PVC water service line to main Home. Magnitude of Construction is: $25,000 to $100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project no . 0217362013 |
||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |