Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Parcel 15 Precast Storm Water Vaults
Infrastructure
Bidding
$50,000 to $65,000 est. value
Tacoma, WA

Bonney Lake 950 Zone Tank and 950 / 1010 Zone Pump Station
New Construction, Infrastructure
Bidding
$8,900,000 est. value
Tacoma, WA

112th Street Southwest Water Main Replacement
Infrastructure
Post-Bid
$757,255 est. value
Lakewood, WA 98499

39th Avenue Southwest Phase 4 Halcyon Water Main Replacement
Infrastructure
Post-Bid
$388,000 est. value
Lakewood, WA 98499

Water Main Replacement Phases 2 and 3
Infrastructure
Results
Puyallup, WA 98371

Toscanos Sinkhole Repair and Drainage
Infrastructure
Results
$550,000 to $650,000 est. value
Puyallup, WA

Frontier Park Horse Arena Cover
Alteration
Post-Bid
$1,600,000 est. value
WA

JBLM North Access Improvement
Infrastructure
Results
$12,000,000 est. value
Lakewood, WA

SR 161 / Washington Avenue North Corridor Streetscape Phase 2
Infrastructure
Post-Bid
$2,300,000 to $2,500,000 est. value
Eatonville, WA 98328

Wastewater Eductor Decant Facility Pipeline
Infrastructure
Results
$800,000 est. value
Tacoma, WA

24th Street East Utility Relocation
New Construction, Infrastructure
Post-Bid
$3,000,000 to $3,750,000 est. value
Sumner, WA 98352

Kansas Street Southwest Outfall Replacement and Calistoga Street West Improvements Project
Infrastructure
Results
$350,000 est. value
Orting, WA 98360

Summit Avenue Water Main Replacement
Infrastructure
Post-Bid
$300,000 est. value
Fircrest, WA 98466

SR 162 East Water Main Replacement Phase 2 and 3
Infrastructure
Results
$200,000 est. value
Puyallup, WA 98375

Reported 07/07/2022 04:16 PM
Project Title

208th Street East/Mountain Highway Extension - Pierce County

Physical Address View project details and contacts
City, State (County) Spanaway, WA 98387   (Pierce County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2023
Bids Due View project details and contacts
Estimated Value $10,598,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Spanaway, Washington. Conceptual plans call for site work for a water / sewer project. Located in the Spanaway Service Basin in Council District 3, the project will construct approximately 3,900 linear feet of 8" sewer main to supporting approximately 190 acres of currently unsewered Urban Growth Area. The project is planned to be completed in 2023 and is funded through Sewer Division Fund 403. Project is included in the Pierce County's - Facilities Management FY 2022-2027 Budget CIP. As of July 6, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated from 2022 to 2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents