Similar Projects
Chapel Crossing
New Construction
Conception
Windermere, FL 32836

Vanguard Street - International Drive Residential Development
New Construction
Conception
Orlando, FL 32819

Cornell Homes Subdivision
New Construction
Design
Orlando, FL

Del Web Oasis
New Construction - 14,000 SF
Design
Winter Garden, FL 34787

Purchase and Development of Wymore Road/Hungerford Property
Bidding
Orlando, FL 32809

CRA Paramore Residential Housing Project
New Construction - 16,427 SF
Post-Bid
$1,800,000 est. value
Orlando, FL 32800

West Lakes Partnership Rehab of a Single Family Home
Renovation
Post-Bid
Orlando, FL 32805

Development, Revitalization, or Rehabilitation of Sites
New Construction, Renovation
Results
Orlando, FL

Co-Developer Services
Results
Winter Park, FL 32789

Ocoee Landings
New Construction - 135,950 SF
Construction
Ocoee, FL 34761

Sunbridge Mixed-Use Development Master Plan
New Construction
Construction
Orlando, FL

Hunters Creek Residential Development
New Construction
Pending Verification
Orlando, FL

Stoneybrook Senior Independent & Assisted Living
New Construction
Conception
Winter Garden, FL 34787

Wilimar Country Estates
New Construction - 44,000 SF
Design
Orlando, FL 32836

Construct Affordable Housing on Surplus County Properties
Post-Bid
Orlando, FL 32801

Last Updated 03/18/2021 08:18 PM
Project Title

Orange County Great Oaks Village Cottage Restroom and Kitchen Renovations

Physical Address View project details and contacts
City, State (County) Orlando, FL 32806   (Orange County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is a level-1 alteration to five (5) existing residential buildings within the Orange County Great Oaks Youth and Family Services Complex. There are two (2) different building types with different floor plan layouts. Both types of cottages will receive new interior finishes to the kitchens such as: new millwork, solid surface counter tops, sink and faucet, some new appliances, flooring, painting and new LED light fixtures. The existing restrooms will also receive new floor and wall tile, new toilets, shower plumbing fixtures, millwork with solid surface counter tops with integrated sinks and new faucets, new mirrors, toilet accessories, paint and new LED lighting.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents