Similar Projects
Sidewalk Construction
Results
KY

Louisville Hyundai Parking & Vehicle Display Expansion
New Construction
Post-Bid
Louisville, KY 40258

Sidewalk Beveling
Results
Louisville, KY

Middletown Eastwood Trail Section 1
Results
Louisville, KY 40245

Parking Lot Striping, Resurfacing and Maintenance
Results
Louisville, KY

Geothermal and East Ramp Expansion Bid Package 1
Post-Bid
Louisville, KY 40209

Community Center Site
Post-Bid
Louisville, KY 40207

L & N Parking Lot Sinkhole Repairs
Infrastructure
Results
$77,350 est. value
Louisville, KY 40203

West Broadway Elementary
New Construction, Alteration - 79,180 SF
Results
Louisville, KY 40210

Concrete Curb Replacement
Infrastructure
Post-Bid
Louisville, KY

Third Street Road Sidewalk Connection Safe Routes to School Project
Infrastructure
Results
Louisville, KY 40281

Replacement and Improvement of Sidewalks in the City
Infrastructure
Post-Bid
Louisville, KY

Transit Authority of River City (TARC) Bus Stop and Sidewalk Improvements
Infrastructure
Results
Louisville, KY

Liberty Financial Remote Parking Lot
Infrastructure
Bidding
Louisville, KY 40223

Lagrange Road Corridor Bicycle/Pedestrian Facility Improvements
Infrastructure
Bidding
Louisville, KY 40222

Last Updated 10/04/2021 11:59 AM
Project Title

3709 East Indian Trail PSC Installation

Physical Address View project details and contacts
City, State (County) Louisville, KY 40213   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000 to $70,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for the installation of a property service connection for 3709 E Indian Trail. The scope of work includes approximately 91 LF of 8” SDR-35 at 2% slope between MH 54546 and MH1 on Sheet C1.0 of the Newburg Area ES Plans (See attached). MH1 is has been installed and is approximately 8.75’ deep and has been cored and plugged. An internal drop will be allowed in MH 54546. A pump around may be required. The flow monitoring equipment in the manhole will be removed by MSD prior to the start of this work. Excavation is considered unclassified, but rock is shown on the attached as-built drawing. Backfill for the pipe in the road and under the sidewalk shall include #57 stone compacted in 1’ lifts. Sewer Marking Tape shall be placed 2’ above the pipe. Trench cut 4’x30’ with Standard Pavement Repair (8” concrete, 2” surface, 1’ cutbacks); Mill and Pave 38’x36’; Replace striping. Remove and replace concrete curb and 5’ wide concrete sidewalk disturbed due to construction. Concrete encase 20 LF of 8” sewer pipe across drainage ditch. Remove and reset existing guardrail as needed. Restore existing drainage ditch with seed and straw/coconut fiber blanket per MSD Standard Specification 9.2.9.3

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents