Similar Projects
8th Street Improvements Motor City Way to Fountain Creek - City of Colorado Springs
Infrastructure
Conception
$1,625,119 CJ est. value
Colorado Springs, CO 80905

Airport Taxiway A Re-Alignment - City of Colorado Springs
Infrastructure
Conception
$14,200,000 CJ est. value
Colorado Springs, CO 80916

AutoZone #5811 / Colorado Springs
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Colorado Springs, CO 80908

Dublin North No. 5 Addition / Pikes Vista
New Construction, Infrastructure
Design
$16,974,000 CJ est. value
Colorado Springs, CO 80923

National Chain Car Dealership / Colorado Springs
New Construction, Infrastructure - 6,827 SF
Post-Bid
$1,000,000 CJ est. value
Colorado Springs, CO 80922

Well D2 Site Improvements
Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Monument, CO 80132

Lift Station No. 1 Additions
Renovation
Results
CO

Concrete Work at Intersections, Involving Asset Protection/repair, Turn Lane Curb Work and Pedestrian Safety Improvements
Infrastructure
Results
$244,433 CJ est. value
Peyton, CO 80831

Hampton Inn
New Construction
Construction
$2,000,000 est. value
Colorado Springs, CO 80900

South Academy Highlands Western Out Lots - Site Work
Infrastructure
Construction
Fountain, CO 80817

Victory Ridge Park
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Colorado Springs, CO 80908

Whataburger / Colorado Springs
Infrastructure, Build-out - 3,800 SF
Pending Verification
$592,800 CJ est. value
Colorado Springs, CO 80918

Playground Renovation & Replacement - City of Colorado Springs
Renovation, Infrastructure
Conception
$800,000 CJ est. value
Colorado Springs, CO 80903

Hancock and Delta Mixed-Use Development
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Colorado Springs, CO 80910

City of Colorado Springs Senior Center
Demolition, New Construction, Infrastructure - 22,500 SF
Post-Bid
$8,000,000 CJ est. value
Colorado Springs, CO 80903

Last Updated 07/26/2023 02:50 PM
Project Title

Booster 2 Pump Station Upgrade

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80911   (El Paso County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $3,413,441 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A description of the work to be performed generally includes construction of a ~2,500 sq ft CMU block building with concrete foundation, potable water booster pump system and bathroom. The pumping system includes (3) three 125 HP pumps, associated piping, controls, electrical panels and wiring, backup generator, pressure relief system, valves, meter and instrumentation. Site work includes 12"/24"/30" diameter field piping, building penetrations, sanitary sewer service and potable water connections, fencing, grading and erosion control, landscaping, and all incidental work required to complete the project as specified in the drawings and specifications. Basis of award will be the lowest responsive and responsible Bid as determined by OWNER. No Bids may be withdrawn within a period of sixty (60) days after the date Bids are opened. The OWNER reserves the right to reject any and all bids or to accept that Bid or combination of Bids, if any, which, in its sole and absolute judgment will under all circumstances best serve the OWNER's interest. No Bid will be accepted from any firm, person, or corporation who is a defaulter as to surety or otherwise, or is deemed incompetent, irresponsible or unreliable by the OWNER. A Bid Bond of 5 % of the Bid will be required. Widefield Water and Sanitation District /s/ Lucas Hale, District Manager General Requirements - Contractors License Required Bonding Requirements - Bid Bond 5 % The OWNER reserves the right to reject any and all Bids and to waive irregularities or informalities in any bid. All engineering questions shall be directed to Mario DiPasquale with JDS-Hydro Consultants, a Division of RESPEC at (719) 227-0072 or mdipasquale@jdshydro.com. Last day for submission of questions shall be March 18th, 2022.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents