Similar Projects
Harbaugh Valley Road Bridge
Infrastructure, Renovation
Conception
$325,000 CJ est. value
Fairfield, PA 17320

Harbaugh Valley Road Bridge
Infrastructure, Renovation
Conception
$325,000 CJ est. value
Fairfield, PA 17320

PA 116 / Trib Willoughby Run
Infrastructure
Design
$1,463,758 CJ est. value
Straban Township, PA 17325

PA 116 / Trib Willoughby Run
Infrastructure
Design
$1,463,758 CJ est. value
Straban Township, PA 17325

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Road Work Project
Results
Fairfield, PA

Paving Woodside Road from SR15 to SR1017
Results
Gettysburg, PA 17325

Willoughby Run Self-Storage Facility
New Construction, Infrastructure - 44,500 SF
Pending Verification
$4,800,000 CJ est. value
Straban Township, PA 17325

Centenial Road Bridge PM
Infrastructure, Renovation
Conception
$540,000 CJ est. value
Gettysburg, PA 17325

PA 116 over Trib Marsh Crk
Infrastructure
Design
$2,126,000 CJ est. value
Gettysburg, PA 17325

Middle School Asphalt
Infrastructure
Post-Bid
Hanover, PA

Road Department - Seal Coat
Results
Gettysburg, PA

PA 116 Main Street Resurface
Infrastructure
Conception
$823,170 est. value
McSherrystown, PA 17344

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

Last Updated 11/10/2022 02:20 PM
Project Title

Spangler Farm Trail

Physical Address View project details and contacts
City, State (County) Gettysburg, PA 17325   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Rejected, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $392,300 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 10, 2022, all bids for this project have been rejected. At this time, it has not been confirmed if the project will be rebid. Construction of approximately .36 miles of trail from the George Spangler Farm Civil War Hospital Site to National Park Service Property. Improvements will include site work, E&S Controls, trail paving, signage, stormwater management, and other miscellaneous site improvements A bid bond by acceptable surety or a certified check made payable to Gettysburg Foundation in the amount of 10% of the maximum bid must be provided by each bidder with their bid. Clarification Deadline: 7/29/2022 3:00 PM A bid bond by acceptable surety or a certified check made payable to Gettysburg Foundation in the amount of 10% of the maximum bid must be provided by each bidder with their bid. Each bidder must be prepared to submit evidence of his qualifications to perform the work. All contractors are required to make a Good Faith Effort to provide the opportunity for Disadvantaged Business Enterprise (DBE) and Small Business Enterprise (SBE) firms to participate in the performance of this construction Contract. Documentation of such solicitations and commitments shall be submitted concurrently with the bid. Notice is hereby given to bidders that this project is subject to the provisions of the Pennsylvania Prevailing Wage Act approved August 15, 1961 (Act No. 442, P.L. 987), as amended. Bidders should refer to federal and state statutes, rules and regulations dealing with the prevention of environmental pollution and the preservation of public and natural resources pursuant to PA Act No. 1972-247. The Contract Time for this project is sixty (60) calendar days. Gettysburg Foundation reserves the right to accept any bid or reject any or all bids.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents