Similar Projects
Cross Park Phase 2 - Pierce County
Infrastructure
Conception
$10,401,782 CJ est. value
Tacoma, WA 98446

I-705/I-5 to Pacific Ave - Expansion Joint Replacement Stage 3
Infrastructure, Renovation
Conception
$922,000 CJ est. value
Tacoma, WA 98402

SR 302/Victor Creek - Remove Fish Barrier
Infrastructure
Design
$2,806,000 CJ est. value
Gig Harbor, WA 98332

SR 302/Purdy Bridge - Bridge Rehabilitation
Infrastructure, Renovation
Design
$5,599,000 CJ est. value
Gig Harbor, WA 98332

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Repair Perimeter Fencing Joint Base Lewis McChord(JBLM)
Infrastructure
Bidding
$250,000 CJ est. value
Joint Base Lewis McChord, WA 98433

Repair Building 09175, Permanent Party UH
New Construction
Post-Bid
WA

VA American Lake Phase 2 Site Development
Demolition, Term Contract, Infrastructure, Alteration
Post-Bid
$10,000,000 to $25,000,000 est. value
Tacoma, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Results
$350,000 est. value
Tacoma, WA 98402

Heritage Gardens
New Construction, Infrastructure
Pending Verification
$38,300,000 CJ est. value
Tacoma, WA 98404

Tacoma Behavioral Healthcare Hospital
New Construction, Infrastructure - 83,300 SF
Pending Verification
$48,400,000 CJ est. value
Tacoma, WA 98405

RFQ Contractor - Renovate Fire Alarm Systems
Renovation
Conception
$5,000,000 CJ est. value
Tacoma, WA 98430

SR 16/Blackjack Creek - Remove Fish Barriers
Infrastructure
Design
$22,770,000 CJ est. value
Gig Harbor, WA 98332

Canyon Road Northerly Extension ROW Acquisition, Relocation, and Appraisal Services
Infrastructure
Bidding
$1,500,000 CJ est. value
Tacoma, WA 98443

Last Updated 08/19/2022 09:06 AM
Project Title

JBLM - Storm Drain Beaumont-Jackson

Physical Address View project details and contacts
City, State (County) Joint Base Lewis McChord, WA 98438   (Pierce County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Military Facility, Site Development, Storm/Sewers
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall supply all supervision, labor, equipment, and materials to perform all work in strict accordance with the MATOC umbrella contract specifications, this statement of work, and identified drawings to provide for the repair of the storm drainage system along Jackson Ave from Beaumont past the Gardner Loop Road intersection part way toward the Madigan gate.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents