Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

Address Pavement Condition
Infrastructure
Conception
$5,500,000 CJ est. value
Elizabethtown, KY 42701

South Green Street Office
New Construction, Infrastructure - 9,120 SF
Design
$1,900,000 CJ est. value
Henderson, KY 42420

Murphy USA #7270 / Russellville
New Construction, Infrastructure - 1,400 SF
Design
$1,500,000 CJ est. value
Russellville, KY 42276

Playworks Event Building & Restroom Building, Waterfront Development Corp., Phase IV
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Louisville, KY 40202

Asphalt Resurfacing - KY 55X and KY 61
Infrastructure
Bidding
$1,500,000 CJ est. value
Columbia, KY 42728

Derrickson Lift Station and Force Main
New Construction, Infrastructure
Post-Bid
Morehead, KY

JC Osborne Water Booster Pump Station
Renovation
Post-Bid
Hyden, KY

B & F Gulf Service Station
Results
$537,801 est. value
Mount Vernon, KY 40456

Poultry Research Facility Relocation - Site Development
Results
Versailles, KY 40383

Arby's / Versailles
New Construction, Infrastructure - 2,460 SF
Construction
$800,000 CJ est. value
Versailles, KY 40383

North Laurel High School Cafeteria Expansion
Addition, Demolition, Renovation, Infrastructure
Construction
$1,100,000 CJ est. value
London, KY 40741

UofL Health Medical Center South
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Shepherdsville, KY 40165

Span Tech
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Glasgow, KY 42141

Address Pavement Condition
Infrastructure
Conception
$3,250,000 CJ est. value
Elizabethtown, KY 42701

Last Updated 10/10/2022 01:01 AM
Project Title

Salyersville Water Intake Pump Replacement

Physical Address View project details and contacts
City, State (County) Salyersville, KY 41465   (Magoffin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the providing of all materials, labor, and equipment for the construction of one (1) 1,000 GPM raw water intake pump. The Contract Documents may be examined at the following locations: Salyersville Water Works, 182 College Street, Salyersville, KY 41465 Summit Engineering, Inc., 3205 Summit Square Place, Lexington, KY 40509 Summit Engineering, Inc., 160 Lanks Branch, Pikeville, KY 41501 Federal wage and hour provisions DO apply to this project. This contract is funded in part by a State Revolving Funds (SRF) loan. Procurement is subject to DOW SRF Procurement Guidance including Davis Bacon Act. Bidders must also comply with Title IV of the Civil Rights Act, the Anti-Kickback Act, the Contract Work Hours Standard Act, 40-CFR 31.36L (3,4, & 6), President's Executive Order No. 11246 for equal opportunity employment and discrimination, 41 CFR 60-4, and make positive efforts to use small, minority, women owned, and disadvantaged businesses. Award of the contract will be made to the lowest, responsive, responsible bidder. WBE (6.9%)

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents