Project Title | SR141 Advance Utility Relocation Under Southbound I-95 |
Physical Address | View project details and contacts |
City, State (County) | DE (New Castle County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $696,214 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1.00 Ls Clearing And Grubbing 650.00 Cy Excavation And Embankment 4.00 Cy Test Hole 1,442.00 Cy Borrow, Type c 295.00 Cy Furn Borrow, Ty c For Pipe And Util Tren 1.00 Ls Removal Of Structures And Obstructions 11.00 Cy Graded Aggr Base Course, Ty b, Patching 10.00 Ton Delaware No. 3 Stone 6.00 Ton Superpave Type c, Pg 64-22, Patching 7.00 Ton Superpave Type b, Pg 64-22, Patching 250.00 Lf Bore 12" Steel Pipe Casing 400.00 Lf Bore 24" Steel Pipe Casing 260.00 Lf Galv Steel Beam Guardrail, Type 1-31 175.00 Lf Saw Cutting, Bituminous Concrete 175.00 Lf Saw Cutting, Concrete, Full Depth 1.00 Ls Initial Expense/De-Mobilization 1.00 Ls Construction Engineering 1.00 Ls Project Control System Development Plan 3.00 Eamo Field Office, Special i 1.00 Ls Maintenance Of Traffic 10.00 Eady Arrow Panels Type c 45.00 Eady Furnish And Maint Portable Chg Mess Sign 5.00 Eady Furn And Maint Portable Light Assembly 28,000.00 Eady Plastic Drums 10.00 Hour Traffic Officers 160.00 Lf Furn And Inst Temp Pcc Saf Barr, Unpin 10.00 Eady Furn And Maint Truck Mount Att, Type Ii 8.00 Each Install Temporary Impact Attenuator 8.00 Each Furn Temp Impact Att Non-g, Red, Lev 3 1,540.00 Eady Temporary Warning Signs And Plaques 20.00 Hour Flagger, New Castle County, State 300.00 Lf Temporary Markings, Tape, 4" 60.00 Lf Perm Pave Striping, Epoxy Wht/Ylw, 5" 20.00 Lf Perm Pave Striping, Epoxy Wht/Ylw, 10" 100.00 Sf Removal Of Pavement Marking Tape 2,400.00 Lf Furn & Inst Up To 4" Sced 80 Hdpe (Bore) 300.00 Lf Furn & Inst Upto 4" Sced 80 Pvc(Opencut) 2,580.00 Lf Furn & Inst Up To 4" Sced 80 Pvc(Trench) 704.00 Lf Silt Fence 383.00 Lf Reinforced Silt Fence 1.00 Each Inlet Sediment Control, Drainage Inlet 60.00 Lf Temporary Slope Drain, 24" 11,667.00 Sy Topsoil, 6" Depth 11,667.0 Sy Permanent Grass Seeding, Dry Ground 11,667.00 Sy Temporary Grass Seeding 5,000.00 Sy Erosion Control Blanket Mulch 44.00 Ton Stabilized Construction Entrance | ||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |