Similar Projects
Upper Brays Bayou Greenway (BR 26) - Braeburn Glen Boulevard to Eldridge Parkway
Post-Bid
$11,100,000 to $12,500,000 est. value
Houston, TX 77074

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Elmside/Woodchase Path
Results
$2,900,000 to $3,300,000 est. value
Houston, TX 77042

Violet Trail Crown - North Phase 2A
Infrastructure
Results
$1,500,000 est. value
Austin, TX

Oak Drive Parking Improvements
Infrastructure
Post-Bid
Wimberley, TX 78676

Sidewalk Installation at the Villas by the Park Apartments
Infrastructure
Results
$27,875 est. value
Fort Worth, TX 76119

Markham Elementary Parking Lot
Infrastructure
Post-Bid
Markham, TX 77456

Construction of Hike and Bike Trails at Cypress Creek Greenway for Harris County Precinct 4
Infrastructure
Results
Houston, TX

Construction of Creekland Sections 1 and 2 Landscape
Alteration
Post-Bid
Cypress, TX

High School Driveway Rehabilitation
Alteration
Results
Orange, TX 77632

Portable Building Deck - Ramp and Walkway Installations
Term Contract
Post-Bid
TX

VA - State Park Improvements
Infrastructure
Results
$642,397 est. value
TX

Concrete Trail, Grading and Drainage, Planting
Infrastructure
Post-Bid
$200,000 est. value
Conroe, TX

IB Magee Retention Pond and Restoration and Improvements
Infrastructure
Results
TX

SS 502 - Bicycle and Pedestrian Improvements
Infrastructure
Results
$260,729 est. value
TX

Reported 06/08/2022 12:00 AM
Project Title

PSJA Tri-City Pedestrian Safety Improvements Project - Phase I

Physical Address View project details and contacts
City, State (County) Alamo, Pharr, San Juan, TX   (Hidalgo County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $2,850,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of building sidewalks within the tri-city area of City of Pharr, City of San Juan and City of Alamo. The sidewalks will connect seven (7) PSJA ISD schools to the neighborhoods, commercial areas, public buildings and existing pedestrian facilities in their vicinities. The design follows the Texas Department of Transportation (TxDOT), City of Pharr, City of San Juan and City of Alamo standards and regulations.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents