Similar Projects
Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Address Pavement Condition of AC Pavement
Infrastructure
Conception
$4,000,000 CJ est. value
Glasgow, KY 42141

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Langley Bullock Industrial Development / Hebron
New Construction, Infrastructure - 230,000 SF
Design
$123,510,000 CJ est. value
Hebron, KY 41048

Prime Car Wash
New Construction, Infrastructure - 11,239 SF
Bidding
$3,000,000 CJ est. value
Florence, KY 41042

Asphalt Resurfacing
Infrastructure
Bidding
$585,949 CJ est. value
Jackson, KY 41339

T-Hangar Site Grading
Infrastructure
Post-Bid
Glasgow, KY

Contract Paving on Various Roads
Infrastructure
Post-Bid
$300,000 CJ est. value
Brooksville, KY 41004

Baseball Field Backstop Safety System
Results
Union, KY 41091

Barren County Fiscal Court, Former Correctional Facility, Building Demolition
Demolition - 19,431 SF
Results
Glasgow, KY 42141

Union Promenade
New Construction, Infrastructure - 155,000 SF
Construction
$150,000,000 CJ est. value
Union, KY 41091

Florence Apartments
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Florence, KY 41042

Residence Inn by Marriott / Florence
New Construction, Infrastructure - 104,321 SF
Pending Verification
$20,000,000 CJ est. value
Florence, KY 41042

Turfway Foodmart
Addition, Demolition, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Florence, KY 41042

Address Pavement Condition of Louie B. Nunn Cumberland Parkway
Infrastructure
Conception
$4,400,000 CJ est. value
Glasgow, KY 42141

Last Updated 05/25/2023 02:33 PM
Project Title

Expansion of Little Sandy Correctional Complex

Physical Address View project details and contacts
City, State (County) Sandy Hook, KY 41171   (Elliott County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Prison/Jail, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $95,840,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Number- 2021-080-S, 2021052 527-CAL4-LS08-00 The new housing units at Little Sandy Correctional Complex will consist of 2 housing unit types herein referred to as Building GC and GD. Building GC will consist of 4 housing units double bunked and under direct supervision. All support and program spaces will be accessible from the pod. A central core will house administrative staff and group treatment rooms. HU1 will contain a cell tier, typical in all housing units. All units within Building GC are planned for medium security. General Population Building GD will consist of 2 housing units double bunked and an additional 2 housing units of mental health (pod) units under direct supervision. All 4 units will contain support, and program spaces found in Building GC. The mental health units will contain sub-dayrooms to restrict the flow of inmates on both the ground floor and the mezzanine. The central core will mimic Building GC with spaces for administrative staff and treatment areas. Both general population and segregation units will have mezzanines. 2 housing pods will be medium security, general population. The 2 remaining mental health units will be maximum security. Service Start : 10/1/2022 Service End : 11/29/2024 ** Prebid meeting - The background check form (following the Advertisement of Bids) must be submitted to Warden McKenzie, donalds.mckenzie@ky.gov by 4:00 PM, Eastern Time on September 2, 2022. List at least two people on the background check form. When forwarding the background check form DO NOT COPY ANYONE; SEND ONLY TO THE WARDEN. You must show proof of COVID vaccination. Face masks are also required to be worn during the prebid meeting.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents