Similar Projects
Turkey Lake Road (C.R. 439) at Vineland Road Intersection Improvements
Bidding
Less than $462,456 est. value
Orlando, FL 32819

Boggy Creek Improvements Project (from Orange/Osceloa Line to South of S.R. 417)
Bidding
$10,285,437 est. value
Orlando, FL 32813

Lakeville Elementary Drive Loop Improvements
Post-Bid
Apopka, FL 32703

Poitras East Master Infrastructure Phase 1B
Post-Bid
Orlando, FL

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

Bike Path/Trail/Earthwork
Results
Less than $3,130,502 est. value

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

SR 417 Widening from Narcoossee Road to SR 528
Bidding
Orlando, FL 32813

Request for Qualifications for Construction Services
New Construction
Post-Bid
Orlando, FL 32811

SR 528 / SR 436 Interchange Improvements and SR 528 Widening from SR 436 to Goldenrod
Results
Orlando, FL 32807

Traffic Calming and Minor Roadway Improvements
Bidding
FL

Resurfacing of City Streets
Post-Bid
Orlando, FL 32800

Resurfacing
Results
Less than $6,973,511 est. value
FL

SR 408 Resurfacing from Woodbury Road to North of SR 50
Bidding
Orlando, FL

Last Updated 04/29/2021 10:11 AM
Project Title

SR 417 Widening from John Young Parkway to Landstar Boulevard

Physical Address View project details and contacts
City, State (County) Orlando, FL 32824   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $116,845,417
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of providing all labor, materials, equipment and incidentals necessary to widened SR 417 from John Young Parkway to Landstar Boulevard from four (4) general use lanes to six (6) general use lanes. All mainline bridges within the project limits, Orange Blossom Trail, Balcombe Road, SR 91 (Florida's Turnpike), Orange Avenue, CSX Railroad, and Landstar Boulevard will also be widened to accommodate the appropriate shoulder widths and additional general use lane. Ramp bridge widening or replacement will also be required at the southbound off-ramp to Orange Blossom Trail and at the northbound off-ramp to Landstar Boulevard. The work also includes, but is not limited to, construction of sound barriers, overhead sign structures and intelligent transportation systems infrastructure. The D/M/WBE participation objective for this project is fifteen percent (15%).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents