Similar Projects
Improvements to Boggy Creak Road (from Simpson Road to S.R. 417)
Infrastructure
Bidding
$850,000 est. value
Orlando, FL 32885

SR 436- Milling and Resurfacing/Traffic Signals/Drainage Improvements
Infrastructure
Bidding
$1,251,339 est. value
FL

Poitras East Master Infrastructure Phase 1B
Post-Bid
Orlando, FL

Request for Qualifications for Construction Services
New Construction
Post-Bid
Orlando, FL 32811

Construction Manager at Risk Services Creative Village - Central Park and Roadway Improvements
Results
Less than $4,000,000 est. value
Orlando, FL 32802

Road Improvements for Remington Community Development District
Results
$745,000 est. value
Orlando, FL 32801

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

Pearson Avenue Phase 2
Infrastructure
Bidding
Winter Park, FL

Poitras East Master Infrastructure Phase 1C and Centerline Drive Segment F
Post-Bid
Winter Park, FL

Orange County Construction Services for the ADA Pedestrian Safety Improvement Program
Term Contract
Results
Orlando, FL 32801

Sligh Boulevard and Columbia Street Improvements
Infrastructure
Bidding
$9,952,564 est. value
Orlando, FL 32806

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Asphalt Milling and Resurfacing with Friction Course and Asphalt Berms
Results
Less than $24,275,209 est. value
FL

Shoulder Rework and Ditch Cleaning and Reshaping
Infrastructure
Bidding
$450,000 est. value

Last Updated 09/22/2021 08:08 AM
Project Title

Boggy Creek Improvements Project (from Orange/Osceloa Line to South of S.R. 417)

Physical Address View project details and contacts
City, State (County) Orlando, FL 32813   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,285,437
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of widening Boggy Creek Road from a two-lane rural roadway to a four-lane divided urban roadway from 375 feet north of the Orange County/ Osceola County Line to 600 feet south of S.R. 417). The net length of the project is approximately 1.138 miles. The project is located in District 4. The project includes but is not limited to the following: 1. Construction of approximately 1.138 miles of widening to a four-lane divided asphaltic concrete urban roadway, with earthwork, curb and gutter, concrete sidewalks, turn lanes, four-foot bike lanes on both sides of the road, sod, etc. In addition, the project includes resurfacing of approximately 550 linear feet of existing roadway. 2. Construction of a closed storm water management and collection system to support the new roadway. 3. Other miscellaneous construction items including signing and striping and landscaping, as required to complete the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents