Similar Projects
Highpoint
New Construction - 588,000 SF
Conception
Stuart, FL 34997

Watercress Cove
New Construction
Conception
North Port, FL

Drivers Club Miami
New Construction - 209,100 SF
Design
$100,000,000 est. value
Miami Gardens, FL

Nolte Road Commercial Park
New Construction
Design
Saint Cloud, FL 34772

Cordova Palms - Site Only
New Construction
Post-Bid
Saint Augustine, FL

Atlantic/Brentwood Deep Injection Well, IW-1 Acidization and Rehabilitation
Post-Bid
Less than $250,000 est. value
Sarasota, FL 34230

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

Unsolicited Proposal for the Development, Operation and Maintenance of a Soccer Complex and Other Facilities
Results
Miramar, FL

Morgan's Cove Assisted Living - Site Work
Construction
$35,000,000 est. value
Saint Augustine, FL

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Waterset By Newland
New Construction
Conception
Apollo Beach, FL 33572

Oviedo on the Park - Lot 4 - Sitework
New Construction
Design
Oviedo, FL 32765

Construction Services for Project Improvements (Phase 1)
Post-Bid
Lakeland, FL 33801

Floridan Aquifer Test Production Well FA-1
Results
$1,332,425 est. value
Stuart, FL 34994

KOA Campground
New Construction
Construction
$3,384,744 est. value
Fort Pierce, FL 34981

Last Updated 05/25/2021 08:46 AM
Project Title

Northwest Well NW-7 Well Drilling and Site Preparation

Physical Address View project details and contacts
City, State (County) Saint Augustine, FL 32092   (Saint Johns County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Pumps and Wells, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a Floridian aquifer production well within the St. Johns County Northwest Wellfield (see attached map Exhibit “C”). The Northwest Water Treatment Plant is located at 3390 International Golf Parkway, St. Augustine, FL 32092. Site preparation per the drawings including, but not limited to, hauling and placement of fill material, road stabilization, permanent cattle fence installation, grading and seeding as shown. The well shall have a 30” surface casing to a depth of approximately 80’ BLS, a 20” steel final production casing to a depth of approximately 240’ BLS, and 19” open borehole to a depth of approximately 400’ BLS.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents