Similar Projects
Donald Ross Road Bascule Bridge
New Construction, Infrastructure
Results
$7,000,000 est. value
FL

Congress Avenue Over the LWDD l-24 Canal Palm Beach County
Renovation, Infrastructure
Post-Bid
$850,000 est. value
West Palm Beach, FL 33422

Structure Repair Pushbutton - Bridges - Districtwide Structures Repairs Pushbutton - Bridges
New Construction, Infrastructure
Results
$1,000,000 est. value

Summit Boulevard Over C-51 Canal Bridge Replacement
Renovation
Post-Bid
$2,000,000 est. value
West Palm Beach, FL 33422

Bridge Replacement
Results
Less than $2,709,829 est. value
FL

Bridge Replacement
New Construction
Results
$104,902,206 est. value
FL

Island Drive Bridge Rehabilitation
New Construction
Results
Delray Beach, FL 33483

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Linton Boulevard Bascule Bridge Concrete Repair
Renovation
Results
$66,000 est. value
Delray Beach, FL 33448

Bridge Structure Repair
New Construction
Results
$400,000 est. value

James L. Turnage Boulevard Bridge Repairs
Renovation, Infrastructure
Post-Bid
West Palm Beach, FL 33422

Bascule Bridge Rehabilitation
New Construction
Results
$1,813,759 est. value
Palm Beach Gardens, FL

6th Avenue South Over Lake Osborne Drive
Results
Less than $8,800,000 est. value
FL

Wabasso Drive Over LWDD LAT. 2 Canal - Federalized
Renovation, Infrastructure
Post-Bid
$800,000 est. value
West Palm Beach, FL 33409

Passenger Loading Bridge Relocation
Results
Riviera Beach, FL

Last Updated 04/28/2022 06:49 AM
Project Title

Flavor Pict Road from SR 7 to Lyons Road

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33422   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of the construction of Flavor Pict Road 2227 feet east of SR 7 as a two-lane roadway. This project will include the construction of a bridge over the LWDD E1 Canal and the improvements of the SR 7 intersection. Location - Flavor Pict Road and Lyons Road ,Palm Beach County, FL

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents