Similar Projects
Jupiter Bridge Pile Test
Post-Bid
Jupiter, FL 33458

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

FL Mango Rd Over Pbc L-2 Canal Bridge Replacement
Results
Less than $900,000 est. value
Royal Palm Beach, FL 33411

Prairie Road Over the LWDD L-8 Canal Bridge Replacement
Results
Less than $950,000 est. value
West Palm Beach, FL 33411

Island Drive Bridge Rehabilitation
New Construction
Post-Bid
Delray Beach, FL 33483

Bridge Repair/Rehabilitation
Results
Less than $338,772 est. value
FL

Linton Boulevard Bascule Bridge Concrete Repair
Renovation
Post-Bid
$66,000 est. value
Delray Beach, FL 33448

Bridge Deck Striping
Results
Less than $500,000 est. value

Singer Island-Palm Beach Isles Bridge Improvements
Results
Riviera Beach, FL 33404

Zipprer Canal Bridge Replacement C-37
Results
FL

Rehabilitation of Aging Pre-Stressed Concrete Piles
Results
Less than $7,909,302 est. value

Bridge Replacement
Results
Less than $2,709,829 est. value
FL

6th Avenue South Over Lake Osborne Drive
Results
Less than $8,800,000 est. value
FL

Bridge Replacement
New Construction
Results
$104,902,206 est. value
FL

Bascule Bridge Rehabilitation
New Construction
Results
$1,813,759 est. value
Palm Beach Gardens, FL

Last Updated 08/20/2021 10:35 AM
Project Title

Passenger Loading Bridge Relocation

Physical Address View project details and contacts
City, State (County) Riviera Beach, FL   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall include the removal of the FMT loading bridge from the Port Canaveral Cruise Terminal 8, including pedestal, attachment to cruise terminal, all vertical supports, and the telescopic passenger loading bridge structure. Included shall be the shipping of components to the Port of Palm Beach, and the unloading, cribbing, securing, and the installation of protective film to protect the structure until ultimate installation on a new foundation at the port cruise terminal. The unassembled components shall be separately and securely placed in the allocated storage areas long berths 2-3.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents