Similar Projects
Last Updated | 08/20/2021 10:35 AM |
Project Title | Passenger Loading Bridge Relocation |
Physical Address | View project details and contacts |
City, State (County) | Riviera Beach, FL (Palm Beach County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work shall include the removal of the FMT loading bridge from the Port Canaveral Cruise Terminal 8, including pedestal, attachment to cruise terminal, all vertical supports, and the telescopic passenger loading bridge structure. Included shall be the shipping of components to the Port of Palm Beach, and the unloading, cribbing, securing, and the installation of protective film to protect the structure until ultimate installation on a new foundation at the port cruise terminal. The unassembled components shall be separately and securely placed in the allocated storage areas long berths 2-3. |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |