Similar Projects
Last Updated | 08/26/2020 02:21 AM |
Project Title | Zipprer Canal Bridge Replacement C-37 |
Physical Address | View project details and contacts |
City, State (County) | FL (Palm Beach County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes but not limited to: The project consists of the construction a new 16-foot wide, 230-foot long, one-lane H15-44 bridge adjacent to the existing bridge and then demolish the existing bridge once the new replacement bridge is certified by a Florida-state certified professional engineer as being completed and safe for use. This project also includes, permitting, and coordination for the construction of the Zipprer bridge, as well as connecting the new bridge at both ends of Mack Road. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |