Similar Projects
Highlander Park Aquatic Complex
New Construction, Infrastructure
Conception
Dunedin, FL 34698

Interstate 275 Express Lane - Florida Department of Transportation
Infrastructure
Conception
$10,000,000 est. value
Saint Petersburg, FL 33747

Schooner Resort Hotel
New Construction, Build-Out, Demolition
Design
Madeira Beach, FL

Sea Captain Hotel
New Construction, Renovation - 7,885 SF
Design
$18,000,000 est. value
Clearwater, FL 33767

770 Apartments
New Construction - 79,981 SF
Post-Bid
$3,000,000 est. value
Saint Petersburg, FL 33701

Imagine Clearwater Park (Buildings, Hardscape, Landscape and Other Site Improvements)
New Construction
Post-Bid
$65,000,000 est. value
Clearwater, FL 34621

Mill and Overlay on Various Street Locations
Results
$1,089,600 est. value
Dunedin, FL

Washington Avenue CDBG Sidewalk Improvements
Results
Largo, FL 33770

AC Marriott
New Construction - 182,690 SF
Construction
$25,000,000 est. value
Clearwater, FL 33767

Courtyard By Marriott - St. Petersburg/Clearwater - Exterior
Renovation
Construction
$1,100,000 est. value
Clearwater, FL 33762

Hotel C
New Construction - 44,695 SF
Pending Verification
Clearwater, FL 33767

Bay Esplanade Suites
New Construction - 16,700 SF
Pending Verification
Clearwater, FL 33767

Pinellas Trail Loop Phase 4 from 126th Avenue North to Ulmerton Road - County of Pinellas
Infrastructure
Conception
Less than $2,180,830 est. value
Largo, FL 33773

The Moxy
New Construction, Renovation - 16,500 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Saint Petersburg, FL 33705

East Bay Drive - Turn Lane Improvements
Alteration
Post-Bid
Largo, FL 33779

Last Updated 11/18/2022 01:03 PM
Project Title

The Miramar Beach Resort

Physical Address View project details and contacts
City, State (County) St Pete Beach, FL 33707   (Pinellas County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $14,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of a rooftop lounge with a swimming pool. As of November 18, 2022, the project is in planning stage, but the owner has put the project on hold. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Demolition, Demolition. 7 Stories Above Grade, New Construction, New Construction. Parking Spaces, 64 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents