Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Grade, Drain, Bridge and Surface - SH 63
Infrastructure
Design
$3,050,508 CJ est. value
Arch, OK 74501

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

DWSRF Project 3 Brewer Road Distribution System Improvements
Alteration
Post-Bid
McAlester, OK 74501

Water Line Replacement
Results
McAlester, OK 74501

Relocation of Waterline for the Swinging Bridge Project
Infrastructure
Results
McAlester, OK

Reconstruct - No Added Lanes
Infrastructure
Design
$4,300,000 CJ est. value
McAlester, OK 74501

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

DWSRF Project 1 Water Tower Controls and Hickory Street Distribution System Improvements
Infrastructure
Results
McAlester, OK 74501

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Installation of PVC and PVC Main Water Line
Infrastructure
Results
$400,000 est. value
McAlester, OK

2nd and 3rd Street Water System Improvements Drinking Water Project
Infrastructure
Post-Bid
$500,000 est. value
McAlester, OK

DWSRF Project 11 Park Avenue Waterline Improvements
Infrastructure
Results
$350,000 est. value
McAlester, OK 74501

McAlester Duplexes and Affordable Rental Home
New Construction, Infrastructure
Post-Bid
$14,000,000 CJ est. value
McAlester, OK 74501

4A Steven Taylor Industrial Park System Improvements
Infrastructure
Results
$647,700 CJ est. value
McAlester, OK 74501

Last Updated 04/06/2023 04:34 AM
Project Title

Utilities - US 69

Physical Address View project details and contacts
City, State (County) McAlester, OK 74501   (Pittsburg County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $782,135 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-69: Begin Approx 2.5 Miles South Indian Nation Turnpike and Extend North Approx 2.1 Miles Ut for 28948(04) As of April 06, 2023, the project is in Final Planning status. Anticipated letting month/year is March, 2023. Length : 2.100 Mi. OKDOT - Utilities - US 69 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents