Similar Projects
Meadowbrook Golf Course - North Well Replacement
Infrastructure
Bidding
Taylorsville, UT 84123

Purchase and Deliver Well Surface and Intermediate Casing Forge
Term Contract
Post-Bid
Salt Lake City, UT 84112

Water Treatment- Green Well
Post-Bid
Riverton, UT

Flat Iron Mesa Well House Construction Project
Results
Sandy, UT 84070

Solids Control for Well in Paradox Basin
Results
Salt Lake City, UT

Drilling Rig and Services for Paradox Basin
Post-Bid
Salt Lake City, UT

Purchase and Deliver Well Casing for Forge
Term Contract
Results
Salt Lake City, UT 84112

Walker Lane Well Rehabilitation
Post-Bid
Less than $2,000,000 est. value
Holladay, UT 84117

Horizontal Well Riverfront Park
Results
South Jordan, UT 84095

Chlorination Updates - Hancock Well and Oak Street Well Projects
Post-Bid
Midvale, Sandy, UT 84094

900 East Well Rehabilitation Project
Term Contract
Results
Murray, UT 84121

900 East Well Re-Equipping Project
Infrastructure
Post-Bid
Murray, UT 84107

Drilling Rig and Services for Forge
Results
Salt Lake City, UT 84112

Bio Polymers Rodi Pipe Replacement
Alteration
Post-Bid
$323,897 est. value
Salt Lake City, UT 84132

Wellhead Equipment for Forge
Term Contract
Results
Salt Lake City, UT

Reported 09/17/2021 12:00 AM
Project Title

Hamilton Well Rehabilitation

Physical Address View project details and contacts
City, State (County) Herriman, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Phase One - Preconstruction Phase Services: Provide the services described in Appendix B (Scope of Construction Manager-General Contractor Services) in support of design development provided by the City’s Design Engineer. During this phase, the Design Engineer will review the existing conditions of the Hamilton Well and provide hydraulic recommendations and assist in development of the rehabilitation procedure during construction. The Well Contractor will prepare a project execution plan, cost models, and project schedules for well rehabilitation during the Preconstruction Phase of its work. The City will then negotiate and finalize the Well Contractor contract to incorporate the GMP for the Project. Phase Two - Construction Phase Services: Assuming a final GMP is agreed upon during Phase One, the City will negotiate a contract with the Well Contractor. Phase Two services will then begin and construction will continue until the Project is completed and fully functional.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents