Similar Projects
Walker Lane Well Rehabilitation
Post-Bid
$385,462 est. value
Holladay, UT 84117

Bio Polymers Rodi Pipe Replacement
Alteration
Post-Bid
$323,897 est. value
Salt Lake City, UT 84132

Flat Iron Mesa Well House Construction Project
Results
Sandy, UT 84070

Solids Control for Well in Paradox Basin
Results
Salt Lake City, UT

Headquarters Well Evaluation & Rehabilitation
Term Contract
Post-Bid

Horizontal Well Riverfront Park
Results
South Jordan, UT 84095

Hamilton Well Rehabilitation
Infrastructure
Post-Bid
Herriman, UT

Drilling Rig and Services for Forge
Results
Salt Lake City, UT 84112

Wellhead Equipment for Forge
Term Contract
Results
Salt Lake City, UT

Housing Bundle for Well Project
Results
UT

Conductor Hole for Forge
Results
Salt Lake City, UT

Coring Services for Forge
Results
UT

4th Avenue Well Project
Results
Less than $2,053,000 est. value
Salt Lake City, UT

Surface and Intermediate Wellhead for Forge
Results
Salt Lake City, UT 84112

Water Treatment Facility - Green Well
Results
Riverton, UT 84065

Reported 01/03/2022 08:51 AM
Project Title

Chlorination Updates - Hancock Well and Oak Street Well Projects

Physical Address View project details and contacts
City, State (County) Midvale, Sandy, UT 84094   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of: the construction of a new chlorination building at Oak Street Well site (located at 7980 South Oak Street, Midvale, Utah) and furnishing and installing chlorination equipment for both the Oak Street and Hancock Well (Hancock Well located at 1000 East 8800 South, Sandy, Utah). Chlorination equipment at the Hancock well will be installed in an existing structure. The Oak Street chlorination building consists of a masonry block structure with a single pitched roof. The new chlorination system at the sites consists of piping valves, chlorination equipment, HVAC, electrical, controls, concrete sidewalks, site work, 4" sewer piping and connection at Oak Street only, and all other associated items and appurtenant work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents