Similar Projects
Hamilton Well Rehabilitation
Infrastructure
Bidding
Herriman, UT

Meadowbrook Golf Course - North Well Replacement
Infrastructure
Bidding
Taylorsville, UT 84123

Drilling, Construction and Testing of the Proposed Stewart Ranches Well
Post-Bid
Francis, UT 84036

Purchase and Deliver Well Surface and Intermediate Casing Forge
Term Contract
Post-Bid
Salt Lake City, UT 84112

Water System Drilling, Construction and Testing
Results
Heber, UT

Flat Iron Mesa Well House Construction Project
Results
Sandy, UT 84070

Water Treatment- Green Well
Post-Bid
Riverton, UT

4800 North Well Pumphouse
Results
Provo, UT 84606

Drilling Rig and Services for Paradox Basin
Post-Bid
Salt Lake City, UT

Ogden Airport Well House Project
Results
Less than $1,500,000 est. value
Ogden, UT 84405

Scipio Town Well Improvements
Post-Bid
Scipio, UT

Solids Control for Well in Paradox Basin
Results
Salt Lake City, UT

Walker Lane Well Rehabilitation
Post-Bid
Less than $2,000,000 est. value
Holladay, UT 84117

Purchase and Deliver Well Casing for Forge
Term Contract
Results
Salt Lake City, UT 84112

Wells 4 and 22 Replacement Project
Post-Bid
Hildale, UT

Reported 09/04/2021 12:00 AM
Project Title

Headquarters Well Evaluation & Rehabilitation

Physical Address View project details and contacts
City, State (County) State-Wide: UT
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The primary purpose of this project is to evaluate and improve the condition of the sole public groundwater supply well at Capitol Reef National Park (CARE). Tasks required to complete this project include removal of the existing well equipment (e.g., two submersible pumps/motors, drop pipes, and cables), well rehabilitation (e.g., brushing, bailing, and/or jetting), pre- and post-rehabilitation video camera surveys, installation of a sounding pipe, reinstallation of existing well equipment, and disinfection of the well. Among other requirements described herein, the contractor will also be required to submit a report describing the camera surveys and well rehabilitation methods, results, and conclusions.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents