Similar Projects
Interactive LED Displays
Bidding
Less than $823,989 est. value
Statesboro, GA

Electric Utility Services for Various Locations
Post-Bid
Marianna, Tallahassee, FL - Jesup, GA - Manchester, Pine Knot, KY - Ayer, MA - Guaynabo, PR - Bennettsville, SC

BCCCA HVAC and Lighting Replacement
Post-Bid
Cartersville, GA 30121

Mechanical Electrical IDIQ
Results
$500,000 to $1,000,000 est. value
Robins Afb, GA 31098

Power Distribution Material (Transformers)
Results
Less than $668,019 est. value
College Park, GA

Engine and Generator Maintenance and Repair Services
Term Contract
Post-Bid
GA

Electrical Switchgear Replacement
Term Contract
Results
Atlanta, GA 30303

Holland Plant Boiler Power Separation
Post-Bid
Atlanta, GA 30313

Water Plant Pump 5 Emergency Generator and ATS
Results
Less than $60,000 est. value
Buford, GA 30518

Energy Conservation Services
Post-Bid
Lincolnton, GA 30817

Airfield Electrical Improvements
Results
Folkston, GA

Purchase of Metal Halide Lamps on an Annual Contract
Term Contract
Post-Bid
GA

Clean Air Coalition - West Central ESCO
Results
Macon, GA

Orion Power Systems UPS
Post-Bid
GA

Admin. Generator, ATS and UPS Install Ocean Terminal
Results
Savannah, GA 31402

Reported 05/12/2020 12:00 AM
Project Title

Unit 3 and 4 Generator Rewind at Hartwell Powerhouse in Hartwell, GA

Physical Address View project details and contacts
City, State (County) Hartwell, GA   (Hart County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Unit 3 and 4 Generator Rewind at Hartwell Powerhouse: Intent of the requirement is to perform all work required to rewind two hydroelectric generating units at Hartwell Powerhouse, Hartwell, GA: - Pre-disassembly mechanical and electrical testing, alignment checks, and disassembly of two hydroelectric generating units. - Perform an electromagnetic finite element analysis of the proposed winding and core design to eliminate air-gap flux stator vibrations at fundamental and harmonic frequencies. - Analyze the existing frames for suitability for continued service with the new cores, keybars, and core clamping systems. - Inspect and evaluate the stator frame sole plates, condition of the frame and sole plate interface and develop options to improve the fit and function as necessary, and verify torque of foundation anchors and hold-down bolts - Design, manufacture, and perform voltage endurance testing on 5 prototype coils. - Manufacturer and perform thermal cycle testing on 5 prototype coils. - Manufacture, shop test, prepare and load for shipment, deliver f.o.b. destination, and unload two complete set of stator coils and all accessories. - Remove the old stator windings, stator cores and stator core clamping systems. - Furnish and install new circuit rings, surge rings, neutral current transformers, and surge arresters. - Furnish, install and test two new stator cores, stator windings and accessories. - Clean and inspect rotor, clean and test the rotor field poles winding, reinsulate the rotor field leads, and at the option of the government, refurbish the rotor poles. - Reassemble, perform start-up, commissioning, and testing of the generator including generator special field tests and model validation tests on the excitation and governor systems.

Details

Division 26 - Electrical, Packaged Generator Assemblies, Engine Generators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents