Similar Projects
Reported | 04/12/2022 12:00 AM |
Project Title | REPAIR B1809 Range Control Facilities (RCF) Gatehouse, B1801 Ramp, Awning and Fire Protection |
Physical Address | View project details and contacts |
City, State (County) | Tyndall AFB, FL 32403 (Bay County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the Statement of Work (SOW). The performed tasks shall be based on the project description, other data furnished in this SOW, and information covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization. The SOW sets forth the requirements for a Request for Proposal (RFP) contract site specific construction effort for the repair of the Range Control Facilities (RCF) Gatehouse, B1801 Ramp, Awning And Fire Protection located on Tyndall AFB, Florida. The Contractor and Design Team shall adhere to the following guidance during design and construction phase(s) of this project: United States Army Corps of Engineers, Uniform Building Code (UBC), Unified Facilities Criteria (UFC) 3-600-01, those sections of the Southern Standard Building Codes not incorporated in the UBC/International Building Code (IBC) for our respective area, International Concrete Repair Institute (ICRI) Guidelines, RUS Bulletin 1751F-643, RUS Bulletin 1753F-151, Air Force Standards, Department of Defense (DOD) Directives, Florida State Statutes, and the Tyndall AFB Facility Excellence Plan (Base Regulations), Occupational Safety and Health Administration (OSHA) Requirements, Department of Environmental Protection (DEP) Regulations, Environmental Protection Agency (EPA) Regulations, ABA Accessibility Compliance Requirements and the standards sited in the TRD. If there is a conflict between these codes, regulations and specifications the most stringent requirements shall apply at all times. Documents listed by and/or provided by the Government are for reference only and do not relieve the Contractor from adherence with applicable codes not specifically addressed. |
||||||||||||||||||||||||||||||||||||
Details | Military Facility, Renovation.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |