Similar Projects
Coca-Cola Florida Manufacturing and Distribution Center
New Construction - 1,400,000 SF
Conception
$300,000,000 est. value
Brandon, FL 33511

Carrollwood Day School Center for Innovation
New Construction - 42,605 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Tampa, FL 33613

Star Distribution Expansion
New Construction - 97,500 SF
Design
Plant City, FL 33563

Warehouse Retrofit-Bldg 1042
Renovation
Post-Bid
Tampa, FL

Offsite Storage Facility
New Construction - 12,000 SF
Post-Bid
Tampa, FL

Cart Barn Remediation, Rocky Point Golf Course
Results
Tampa, FL 33634

Provide and Install A Pre-Engineered Metal Building and Sidewalks
Results
Tampa, FL 33619

Construct CES Warehouse
Construction
$1,000,000 to $5,000,000 est. value
Macdill AFB, FL

Construct FSS Warehouse
New Construction
Construction
$1,000,000 to $5,000,000 est. value
Macdill AFB, FL

Channelside Self-Storage Facility
New Construction
Pending Verification
Tampa, FL 33602

Amazon Delivery Station
New Construction - 123,769 SF
Design
$20,000,000 est. value
Tampa, FL 33611

Century Storage
New Construction - 18,100 SF
Post-Bid
Riverview, FL 33579

Design-Build Transload Warehouse Facility
New Construction - 7,700 SF
Results
Tampa, FL 33602

Airfield Maintenance Equipment Storage Building Addition
Addition - 10,000 SF
Construction
$1,518,733 est. value
Tampa, FL 33607

Construction Manager Owners Representative New Facility Development
New Construction - 46,375 SF
Results
$5,000,000 to $10,000,000 est. value
Odessa, FL 33556

Last Updated 04/29/2022 10:05 AM
Project Title

Install Police Evidence Secured Storage

Physical Address View project details and contacts
City, State (County) Tampa, FL 33612   (Hillsborough County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project 673-21-122, DB Install Police Evidence Secured Storage Building 42. The contractor shall provide all labor, materials, tools, and design build services to provide a complete and functioning secured storage area as reflected in the solicitation. Project is located at JAHVH in the Police Administration Offices on the ground floor of building 42, located on 131st Street, Tampa, FL.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents