Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Campus Wayfinding and Signage Plan
Alteration
Bidding
La Verne, Walnut, CA 91789

Various Locations Pavement Renovation No. 54 and Sewer Replacement
Infrastructure
Bidding
$12,500,000 est. value
San Francisco, CA

Compost Leachate Pond Improvements
Renovation
Post-Bid
$1,900,000 est. value
Auburn, CA 95603

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Design
Fresno, Sequoia National Park, CA

Construct Soldier Pile Retaining Wall, Repair RSP and HMA paving
Infrastructure
Bidding
$16,000,000 est. value
CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

SB1 Road Maintenance Projects at Various Locations, FY 2020-2021
Infrastructure
Results
Hollister, CA

Roadway Excavation, JPCP and Furnish Polyester Concrete Overlay
Infrastructure
Bidding
$22,300,000 est. value
CA

Levee Maintenance Project
Infrastructure
Post-Bid
Stockton, CA 95214

County Roadway Drainage Improvement Project
Infrastructure
Results
CA

Last Updated 09/17/2021 04:53 PM
Project Title

PW Pedestrian Safety Improvements

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94158   (San Francisco County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

OBE : 6.7% Located at Jones St/Ellis St, California St/Hyde St, 8th St/Minna St in San Francisco, California and consists of curb ramp construction, drainage work, traffic signal modifications, electrical work, structural work, traffic control, and all related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents