Similar Projects
Master As-Needed Agreement M15 Electrical Services
Alteration
Bidding
$700,000 est. value
San Francisco, CA

New 400-Amp Panel for Future Electric Vehicle Charging Stations, and Concrete Pad for Edison's Surface Mounted Transformer & Required Conduits
Alteration
Bidding
Torrance, CA 90504

Emergency Backup Generator
Alteration
Post-Bid
CA

Uninterruptable Power Supply (UPS) Systems
Alteration
Post-Bid
Fresno, CA

Better Way Electrical Service or HVAC Project
Alteration
Results
$100,000 to $300,000 est. value
Yuba City, CA 95991

PW Transit As-Needed Contract No. 2
Infrastructure, Alteration
Results
$3,000,000 est. value
San Francisco, CA

Design Build Contract-Public Safety Building Generator Replacement
Alteration
Bidding
Santa Rosa, CA 95404

Generators For Water And Wastewater Facilities
Infrastructure
Post-Bid
Santa Rosa, CA

2210 Napa-Vallejo Highway Temporary Construction Power
Alteration
Results
$75,000 est. value
Napa, CA 94559

Phase II District-Wide Building Automation HVAC Systems and Lighting
Alteration
Bidding
Concord, CA

Jameson Pump Station VFD Replacement and Pump Station Emergency Power Transfer and Generator Connection Improvements
Alteration
Post-Bid
Fairfield, CA 94534

Millbrae Recreation Center - Low Voltage Systems Installation
Infrastructure
Results
Millbrae, CA 94031

FMS Paving and Lighting
Infrastructure, Alteration
Bidding
$1,500,000 est. value
Los Alamitos, CA 90720

High Voltage Testing Repair
Alteration
Post-Bid
Sunnyvale, CA

Low Voltage and Network Cabling
Alteration
Results
Torrance, CA 90503

Reported 09/15/2021 12:00 AM
Project Title

2001 North Garey Avenue Power Upgrade

Physical Address View project details and contacts
City, State (County) Walnut, CA 91789   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of furnishing all necessary materials, labor, tools & equipment for installation of a concrete pad, cabinet, conduit, cabling, conductors, grounding, and all components to achieve the intended function of the system in conformance with applicable State and City Codes and related equipment, demolition of existing panel, reconnection of the building electrical system to the new panel, testing, necessary rerouting and adjustments, restoration, painting and all other required equipment labor and materials to return the building back to full function and original conditions.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents