Similar Projects
Atlantic North Shopping Center
New Construction, Infrastructure - 68,000 SF
Conception
$18,000,000 CJ est. value
Jacksonville, FL 32225

Fire Station Renovation & Construction
New Construction, Renovation
Conception
$21,000,000 est. value
Jacksonville, FL

On the Move Car Wash
Demolition, New Construction, Infrastructure - 4,983 SF
Design
$2,700,000 CJ est. value
Jacksonville, FL 32216

The Hardwick at Ford on Bay
New Construction, Infrastructure - 25,000 SF
Design
$140,000,000 CJ est. value
Jacksonville, FL 32202

Church of Eleven 22 Remodel
Build-out, Infrastructure - 37,125 SF
Post-Bid
$12,000,000 CJ est. value
Jacksonville, FL 32218

JIA Daily Surface Lot Rehabilitation
Infrastructure
Post-Bid
Jacksonville, FL 32218

San Pablo Road South Widening Project
Infrastructure
Results
Jacksonville, FL 32214

Countywide Program Management Services for Resurfacing and Sidewalk Construction
Infrastructure
Results
Jacksonville, FL

Fire Station 65
New Construction
Construction
$2,800,000 est. value
Jacksonville, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Becknell at Westlake Lot 21
New Construction, Infrastructure - 1,108,080 SF
Pending Verification
$17,000,000 CJ est. value
Jacksonville, FL 32219

Fairfield Inn & Suites by Marriott / West Jacksonville
New Construction, Infrastructure - 61,600 SF
Pending Verification
$9,910,000 CJ est. value
Jacksonville, FL 32254

Emerald Trail - Hogan Street Connector - City of Jacksonville
Infrastructure
Conception
$5,760,000 CJ est. value
Jacksonville, FL 32202

Home2 Suites By Hilton / Jacksonville
New Construction, Infrastructure - 62,500 SF
Design
$17,000,000 CJ est. value
Jacksonville, FL 32204

CRA Project - Phase 3 - Parks, Riverwalk, Trails, Waterfront Boardwalk, and Roadways
Infrastructure
Post-Bid
Jacksonville, FL

Last Updated 12/07/2022 12:23 AM
Project Title

New Fire Station #66 - City of Jacksonville

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32277   (Duval County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $7,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is the construction and staffing of a new fire station in the Merrill Rd. and Hartsfield community. A new Fire Engine and Rescue unit is included in this enhancement. APP allocation is slated to be $41,250. As of February 11, 2021, this project is in the conceptual phase and on hold. As of December 07, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents