Similar Projects
Miro Corners Parking
New Construction
Conception
$665,468 est. value
Hollywood, FL 33314

Osceola Technical College (TECO) Parking Lot Expansion
Post-Bid
Kissimmee, FL 34744

Sidewalk Replacement at Public Housing Property
Post-Bid
Eustis, FL 32726

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Results
Less than $1,158,847 est. value
Jacksonville, FL 32099

SW 27th Multi-Use Path
Results
Less than $367,000 est. value
Gainesville, FL

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

Repair Several Walkways and Parking Spaces at Rental Properties
Post-Bid
Bradenton, FL 34208

City of Freeport - Pool Parking Lot Paving
Results
Less than $39,266 est. value
Freeport, FL

Park Asphalt Overlay and New Parking at John Stretch Memorial Park, Haverhill Park and Glades Pioneer Park
Post-Bid
Haverhill, FL 33415

Six Mile Cypress Shared use Path from Winkler Avenue to Challenger Boulevard
Results
Less than $145,666 est. value
Fort Myers, FL 33901

Harvest Center Sidewalk Improvements
Post-Bid
Homestead, FL

Parking Lot Resealing at Trails and Tails Park and Veterans Park
Results
Less than $22,000 est. value
Doral, FL 33178

Dixie Manor Apartments Sidewalk Replacement Project
Post-Bid
Boca Raton, FL 33432

Myrtle Street Improvements, Phase 3
Results
Less than $2,536,473 est. value
Sarasota, FL 34234

Last Updated 05/25/2021 10:29 AM
Project Title

CDBG Sidewalk Improvement Project

Physical Address View project details and contacts
City, State (County) Sebastian, FL 32958   (Indian River County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors to provide design and construction services for the CDBG Sidewalk Improvement Project on North Central Avenue in the downtown Community Redevelopment Agency (CRA) area. Sidewalk improvements will include repair and replacement to eliminate slum and blight, complying with ADA standards. A larger scale Project Detail is on page 27 and as built right-of-way (ROW) surveys are available. The Contractor shall provide sidewalk design and layout, all labor, equipment, materials and supervision to accomplish the necessary work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents