Similar Projects
Forsyth Technology Park - Master Plan
New Construction - 1,052,750 SF
Conception
$85,000,000 to $90,000,000 est. value
Cumming, GA 30040

Spring Place Road Industrial Building
New Construction - 1,000,000 SF
Conception
$10,000,000 CJ est. value
Cartersville, GA

A1 Stake Mill
New Construction - 7,600 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Norcross, GA 30093

The Savannah Portside International Park - Phase 2
New Construction
Design
Garden City, GA 31408

Electric Construction Renovation
Renovation
Bidding
Statesboro, GA

FedEx Ground
New Construction - 225,997 SF
Post-Bid
$10,000,000 CJ est. value
Augusta, GA 30805

95 Logistics at Pooler Parkway - Phase I
New Construction - 348,320 SF
Construction
$7,432,254 est. value
Pooler, GA 31322

The Savannah Portside International Park
New Construction - 5,018 SF
Construction
$10,000,000 CJ est. value
Garden City, GA

Savannah Manufacturing Center - Phase I
New Construction - 30,804,000 SF
Pending Verification
$10,000,000 CJ est. value
Savannah, GA 31302

Warehouse
New Construction - 686,000 SF
Pending Verification
$10,000,000 CJ est. value
Palmetto, GA 30268

Wire Park - Phase I
New Construction, Renovation - 199,480 SF
Conception
Watkinsville, GA 30677

The Savannah Portside International Park - Phase 3
New Construction
Design
Garden City, GA 31408

Greenwood Industrial Park - Lot 900
New Construction
Pending Verification
McDonough, GA 30253

Amazon
New Construction - 2,250,000 SF
Conception
$10,000,000 CJ est. value
Appling, GA 30802

Vista Ridge Commercial Development
New Construction
Pending Verification
Suwanee, GA 30024

Last Updated 01/27/2020 11:20 AM
Project Title

The Cubes at Bridgeport - Shell

Physical Address View project details and contacts
City, State (County) Newnan, GA 30263   (Coweta County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse
Contracting Method
Project Status Construction Commenced June 2018, Construction Complete as of October 2019
Bids Due View project details and contacts
Estimated Value $74,444,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase I includes the 1,002,150 square foot speculative building with 40-foot clear height.

Details

1,250,000 SF - 1 Industrial Warehouse, 1 Story Above Grade, 1,002,150 SF New Construction, 1 Industrial Warehouse, 1 Story Above Grade, 611,050 SF New Construction, 500 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Door Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Laboratory Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Classroom Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Fans, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents