Similar Projects
Forsyth Technology Park - Master Plan
New Construction - 1,052,750 SF
Conception
$85,000,000 to $90,000,000 est. value
Cumming, GA 30040

Spring Place Road Industrial Building
New Construction - 1,000,000 SF
Conception
$10,000,000 CJ est. value
Cartersville, GA

The Savannah Portside International Park - Phase 2
New Construction
Design
Garden City, GA 31408

The Savannah Portside International Park - Phase 3
New Construction
Design
Garden City, GA 31408

Electric Construction Renovation
Renovation
Bidding
Statesboro, GA

FedEx Ground
New Construction - 225,997 SF
Post-Bid
$10,000,000 CJ est. value
Augusta, GA 30805

The Cubes at Bridgeport - Shell
New Construction - 1,250,000 SF
Construction
$74,444,000 est. value
Newnan, GA 30263

95 Logistics at Pooler Parkway - Phase I
New Construction - 348,320 SF
Construction
$7,432,254 est. value
Pooler, GA 31322

Savannah Manufacturing Center - Phase I
New Construction - 30,804,000 SF
Pending Verification
$10,000,000 CJ est. value
Savannah, GA 31302

Warehouse
New Construction - 686,000 SF
Pending Verification
$10,000,000 CJ est. value
Palmetto, GA 30268

Wire Park - Phase I
New Construction, Renovation - 199,480 SF
Conception
Watkinsville, GA 30677

The Savannah Portside International Park
New Construction - 5,018 SF
Construction
$10,000,000 CJ est. value
Garden City, GA

Greenwood Industrial Park - Lot 900
New Construction
Pending Verification
McDonough, GA 30253

Amazon
New Construction - 2,250,000 SF
Conception
$10,000,000 CJ est. value
Appling, GA 30802

Vista Ridge Commercial Development
New Construction
Pending Verification
Suwanee, GA 30024

Last Updated 03/05/2020 02:33 PM
Project Title

A1 Stake Mill

Physical Address View project details and contacts
City, State (County) Norcross, GA 30093   (Gwinnett County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse
Contracting Method Qualified Bidding.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Industrial Warehouse, 1 Story Above Grade, 7,600 SF New Construction, 0.78 Acre.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents