Similar Projects
Northeast Georgia Cancer Center
New Construction - 79,692 SF
Design
Athens, GA 30607

Repair Ground Control Approach Radar GCA/RAPCON Support Facility, Building 557 and Demo Obselete Buildings and Concrete Structures, Buildings 545 and 557B&C
Demolition, Renovation, Infrastructure
Design
$1,000,000 CJ est. value
Marietta, GA 30060

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Firearms Training Facility Construction
Post-Bid
GA

DHS/ICE Operations and Maintenance
Renovation
Post-Bid
Fort Benning, GA

DB/DBB IDIQ MACC for Naval Submarine Base Kings Bay, GA
Results
Kings Bay, GA

Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for Naval Facilities Engineering Command Southeast Area of Operations N69450-20-R-0097
Results
$20,000,000 to $100,000,000 est. value

Northeast Georgia Cancer Center
Addition
Construction
Athens, GA 30607

Piedmont Newnan Hospital Acute Inpatient Beds Addition
Addition, Demolition, Infrastructure
Construction
$62,000,000 CJ est. value
Newnan, GA 30265

CHI Memorial Hospital
New Construction, Infrastructure
Pending Verification
$134,500,000 CJ est. value
Ringgold, GA 30736

Doctors Hospital of Augusta Freestanding Emergency Room
New Construction, Infrastructure - 12,760 SF
Pending Verification
$12,500,000 CJ est. value
Evans, GA 30809

P658 Nuclear Regional Maintenance Facility (Nrmf), Naval Submarine Base Kings Bay
Demolition, New Construction, Infrastructure, Renovation - 137,153 SF
Design
$250,000,000 CJ est. value
Kings Bay, GA 31547

Construct Gate Complex Robert B. Miller Jr. Road
Infrastructure, Renovation
Post-Bid
$7,029,150 CJ est. value
Savannah, GA 31401

Repair TBUP Building 399 Phase 2
Renovation
Results
$25,000,000 to $100,000,000 est. value
Fort Benning, GA

Last Updated 03/03/2023 09:42 AM
Project Title

RFQ Design - EHRM Infrastructure Upgrades, Augusta (Downtown)

Physical Address View project details and contacts
City, State (County) Augusta, GA 30904   (Richmond County)
Category(s) Government/Public, Medical
Sub-Category(s) Hospital, Military Facility
Contracting Method Competitive Bids
Project Status Conceptual Design, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 3, 2023, further details regarding design and construction have not been identified. *The previous closed solicitation is listed below for reference. PRESOLICITATION NOTICE THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR STANDARD FORM (SF) 330'S ARCHITECT-ENGINEER QUALIFICATION PACKAGES ONLY. ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. THE GOVERNMENT WILL NOT PAY, NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. 1. GENERAL INFORMATION: Veterans Health Administration (VHA) Program Contracting Activity Central (PCAC) is seeking sources and intends to award a firm-fixed price design contract for Architect-Engineering (A-E) services for the development of complete construction documents, which include working drawings, specifications, reports and construction period services for Project # 509-22-701 EHRM Infrastructure Upgrades Augusta (Downtown) project located at the Charlie Norwood VA Medical Center in Augusta, GA. The A-E Services contract that is anticipated to be awarded will be procured in accordance with the Selection of Architects and Engineers Statute [formerly known as the Brooks Architect Engineer Act], Federal Acquisition Regulation Part 36.6 Architectural and Engineering Services and VA Acquisition Regulation 836.6. In accordance with FAR 36.209 Construction Contracts with Architect-Engineer Firms, no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative. 2. PROJECT INFORMATION This project is a 100% Set-Aside for Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB). The NAICS Code for this procurement is 541330 Engineering Services and the annual small business size standard is $16.5M. This project requires a full design team to complete this project. The projected award date for the anticipated A-E contract is on or before July 1, 2022. The anticipated period of performance for completion of design is 300 calendar days after notice of award. The magnitude of construction is between $10,000,000.00 and $20,000,000.00. 3. A-E SELECTION PROCESS: Firms submitting SF 330 s in response to this announcement, not later than the closing date and time specified herein and in accordance with submission requirements, will be considered for evaluation. The selection will be made as follows: SF 330s will be evaluated in accordance with the primary selection criteria as stated in this presolicitation notice. These evaluations will determine the most highly qualified firms for this particular requirement. In accordance with FAR 36.602-3-(c), at least three (3) of the most highly qualified firms will then be notified of the Government s intent to hold discussions. All firms not invited to participate in discussions will be notified at this time. Discussions will be held with the most highly qualified firms in the form determined to be most advantageous and economical by the contracting officer. This may include in writing, via phone interview or in-person interview presentations. However, the form of discussions will be the same for all firms. The firms invited to participate in discussions will be notified by email and provided further instructions, to include any questions or topics to address. Following the completion of discussions, the firms will be evaluated and ranked for selection based on the primary and secondary selection criteria (if necessary), and the most highly qualified firm will be selected and subsequently sent the solicitation. The final evaluation and ranking will consider the SF330 submission for each firm, as well as additional information obtained via discussions. A site visit will be authorized for the highest rated firm during the negotiation process. An award will be made as long as the negotiation of rates and hours leads to a fair and reasonable determination of the final contract price. If negotiations are not successful with the highest rated firm, the firm will be notified that negotiations have been terminated. Negotiations will then be initiated with the next highest rated firm, and so on until award can be made. 4. SELECTION CRITERIA: Firms responding to this notice will be evaluated and ranked using the primary and secondary selection criteria listed below. The factors are listed in descending order of importance. The evaluation will consider how each factor is addressed and how it is formatted to coincide with the selection criteria. Primary Selection Criteria: Specialized experience and technical competence in the design of network infrastructure installation, renovations, and/or upgrades to information technology (IT) systems (either as solely IT projects or incorporated into new space/renovation projects). Work shall include networking back bone fiber optics, structured cabling, electrical distribution upgrades, uninterruptable power systems (UPS), electrical bonding, building management systems/building automation systems (BMS/BAS), HVAC, telecommunication room renovations/expansions/relocations, data center reconfiguration, electronic and physical security upgrades, and all such systems and components as may be necessary to achieve project goals. Other specialized experience includes experience in critical path scheduling, fire protection, construction infection control proto-cols, energy conservation and sustainable design practices. Include Government and private experience on project similar in size, scope and complexity and experience with project phasing to maintain hospital operations during construction. The evaluation will consider the management approach, coordination of disciplines and subcon-tractors, quality control procedures, prior experience of the prime firm and any key subcontractors working together on relevant projects and familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. The information provided in section F and G of the SF 330 will be used to evaluate this evaluation factor. Professional qualifications necessary for satisfactory performance of required service. The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered or certified by a US state, the District of Columbia or a US territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. At a minimum, the offeror shall describe the professional qualifications and not less than five (5) years of experience in the required disciplines. Disciplines required for this project include, but are not limited to: Architecture, Mechanical, Electrical, Plumbing, Structural, Civil, Fire Protection, Hazardous Material Abatement/Industrial Hygiene, Physical Security (note must hold the Certified Protection Professional (CPP) or Physical Security Professional (PSP) certification issued by ASIS International), Cost Estimation, Project Management, a BICSIA(R) Registered Communications Distribution Designer (RCDDA(R)). The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority]______________________, [company] __________________ certify that the team proposed to perform under this re-quirements demonstrates the capability of 50% SDVOSB performance in com-pliance of 48 CFR 852.219-10. Information provided in sections C through E of the SF 330 will be used to evaluate this factor. Capacity to accomplish work in the required time. The evaluation will consider the firm s plan and ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. Provide the available capacity of required disciplines by providing current project workload, inclusive of all projects awarded during the previous 12 months and the full potential value of any current indefinite delivery contracts. The information for this factor shall be provided in Section H of the SF 330. Please ensure the capacity applies towards the team/personnel provided in the SF 330. Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. Include CPARs data for the projects referenced in section F of the SF330. If CPARS data is not available, Past Performance Questionnaires (PPQs) will be accepted. Please utilize the attached PPQ document. CPARs data and PPQs will not be included in the page count. All projects provided in the SF 330 must be completed by the office/branch/individual team member actually performing the work under this contract. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. The information for this factor shall be provided in Section H of the SF 330. Knowledge of the locality, to include specific knowledge of certain local conditions or project site features, such as geological features, climatic conditions, local construction methods or local laws and regulations. The information for this factor shall be provided in Section H of the SF 330. Experience in construction period services for projects similar in scope to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates. The information for this factor shall be provided in Section H of the SF 330. Secondary Selection Criterion*: Geographic location. Location of the firm, as measured by the driving distance (miles) between the Offeror s principal business location and the Charlie Norwood VA Medical Center 1 Freedom Way Augusta, GA 30904 Determination of the mileage will be based on Google Maps (https://www.google.com/maps/dir/). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF 330 submission. SUBMISSION REQUIREMENTS: The below information contains the instructions and format that shall be followed for the submission of the SF 330, Statement of Qualifications: Submit ONE (1) SF 330, Statement of Qualifications, via email to the Contract Specialist Gregory Parker Gregory.parkerjr@va.gov . This shall include SF 330 and any applicable attachments. All responses are due on or before May 16, 2022, at 3:00 PM Eastern Time. The SF 330 shall be submitted in one email and have a file size shall be no larger than 5 MB. No hard copies will be accepted. The subject line of the email shall read: SF 330 Submission; 36C77622R0091 EHRM Infrastructure Upgrades Augusta (Downtown) The submission must include the SF 330, Architect/Engineer Qualifications (form is available on-line at http://www.cfm.va.gov/contract/ae.asp). The page limitation of the SF 330 shall not exceed a total of 35 pages. This includes title page, table of contents, and any other relevant information. Each page shall be in in Arial size 12 font, single spaced. Part II of the SF 330 and any Contractor Performance Assessment Rating System (CPARS) reports will not count as part of the page limitations. All SF 330 submissions must include the following information either on the SF 330 or by accompanying document: 1) Cage Code; 2) Unique Entity ID (Dun & Bradstreet Number); 3) Tax ID Number; 4) The E-mail address and Phone number of the Primary Point of Contact; 5) A copy of the firms Vet Biz Registry. All questions shall be submitted via email to Gregory.parkerjr@va.gov. NOTE: Only submissions from SDVOSB concerns will be acceptable for this project. In order for an SDVOSB to be considered as a proposed contractor, the firm must be verified and visible by VET Biz (www.vetbiz.gov) and registered in the System for Award Management (SAM) database (www.sam.gov) at time of submission of their qualifications. Failure of a proposed SDVOSB to be verified by the CVE at the time the SF-330 is submitted shall result in elimination from consideration as a proposed contractor. All Joint Ventures must be CVE verified at time of submission and submit agreements that comply with 13CFR 125.15 prior to contract award. SF 330 submissions received after the date and time specified will not be considered. Late proposal rules per FAR 15.208 will be followed for late submittals. Firms not providing the required information may not be evaluated. All information must be included in the SF 330 submission package. It is the offeror s responsibility to check the Contract Opportunities website at: www.sam.gov for any revisions to this announcement prior to submission of SF 330s. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers, Flagpoles.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Casework, Furniture, Office Furniture, Seating, Institutional Furniture, Healthcare Furniture, Multiple Seating.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents